My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD04994
CWCB
>
Floodplain Documents
>
Backfile
>
4001-5000
>
FLOOD04994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:47:55 PM
Creation date
10/5/2006 1:10:26 AM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
na
Basin
Statewide
Title
Guidelines on Selection of Acceptable Flood Capacity for Dams
Date
3/1/2000
Prepared By
Australian National Committee on Large Dams
Floodplain - Doc Type
Educational/Technical/Reference Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />! I <br />I <br />I <br /> <br />TERM <br /> <br />DEFINITION <br /> <br />Scenario <br /> <br />A unique combination of states, such as initiating event, <br />conCUIIe1lt wind state, prior storage state; gate operating <br />state, failure mode, downstream and tributary concurrent <br />flows. <br /> <br />Societal risk criterion <br /> <br />Thesocially acceptable level of risk in terms of events that <br />impact on society at a community, regional or national <br />level <br /> <br />System response <br /> <br />How a dam responds, measured as probability of failure, <br />to a given scenario of applied loads and concurrent <br />conditions <br /> <br />Tolerable risk <br /> <br />The maximum risk that society can live with. Higher <br />risks cannot be accepted <br /> <br />Warning Time (W1) <br /> <br />Warning Time is the time elapsed between initiation of a <br />formal warning by public safety officials through radio, <br />TV, direct warning, or otherwise, for a selected PAR to <br />evacuate, and the time at which the leading wave of the <br />failure flood reaches the PAR (USBR, 19&9) <br /> <br />36 <br /> <br />ANCOLD Guidelines on Selection of an Acceptable flood Capacity for Dams <br />
The URL can be used to link to this page
Your browser does not support the video tag.