Laserfiche WebLink
<br />SOMA-2 <br /> <br />FINAL SUMMARY OF MAP ACTIONS <br /> <br />Community: DURANGO, CITY OF <br /> <br />Community No.: 080099 <br /> <br />To assist your community in maintaining the Flood Insurance Rate Map (FIRM),we have summarized <br />below the previous Letter of Map Change (LOMC) actions (i.e., Letters of Map Revision (LOMRs) <br />and Letters of Map Ammendment (LOMAs)) that will be affected when the revise FIRM becomes <br />effective on OS/211200 I. <br /> <br />1. LOMRs and LOMAs Incorporated <br /> <br />The modifications effected by the LOMRs and LOMAs listed below will be reflected on the revised <br />FIRM. However, these LOMRs and LOMAs will remain in effect until the revised FIRM becomes <br />effective. <br /> <br />LOMC <br /> <br />Ca.. No. <br /> <br />Dat. <br />Iaaued proj ect Identifier <br /> <br />Old <br />Panel <br /> <br />Ne. <br />P""el <br /> <br />2. LOMRs and LOMAs Not Incorporated <br /> <br />The modifications effected by the LOMRs and LOMAs listed below will not be reflected on the revised <br />FIRM because of scale limitations or because the LOMR or LaMA issued had determined that the <br />lot(s) or sbucture(s) involved were outside the Special Flood Hazard Area, as shown on the FIRM. <br />These LOMRs and LOMAs will remain in effect until the revised FIRM becomes effective.' These <br />LOMRs and LOMAs will be revalidated free of charge I day after the revised FIRM becomes effective <br />through a single letter that reaffirms the validity of the previous LOMC. <br /> <br />LOMC <br /> <br />Case No. <br /> <br />Date <br />Issued <br /> <br />Project Identifier <br /> <br />Old <br />Panel <br /> <br />Ne. <br />Panel <br /> <br />LOMA <br /> <br />96-08-252A <br /> <br />10/03/1996 <br /> <br />CLOVIS 1ST ADDTN, BlK2, lOT 10-2617 COLUMBINE <br />AVE <br /> <br />08009900050 <br /> <br />0800990005E <br /> <br />3. LOMRs and LOMAs Superseded <br /> <br />The modifications effected by the LOMRs and LOMAs listed below will not be reflected on the fmal <br />revised FIRM because they are being superseded by new detailed flood hazard information or the infor- <br /> <br />mation available was not sufficient to make a determination. The reason each is being superseded is <br />noted below. These LOMRs and LOMAs will no longer be in effect when the revised FIRM becomes <br />effective. <br /> <br />11/20100 <br /> <br />Page 10'2 <br />