Laserfiche WebLink
<br />The FHBM was prepared using approximate floodplain techniques. It was not accompanied by a <br />report detailing its engineering basis or its uses for floodplain management. This FIR provides <br />limited engineering information to fulfill that need. <br /> <br />Community ResDonse to the CWCB Desilmation and ADDroval Process <br /> <br />A letter from the CWCB was transmitted to the Town of Akron regarding the Board's proposed <br />action for designation and approval of this Floodplain Information Report and the Akron FHBM. <br />The Town sent a letter requesting that the CWCB designate and approve floodplain information <br />currently available to the community. In that letter and at a meeting between CWCB staff and the <br />Town Clerk, the town indicated its support of the Board's action. The Town Clerk did indicate <br />that, on the whole, the drainageways in Akron had not proven to be significant problems for the <br />community. <br /> <br />2 <br />