My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD04928
CWCB
>
Floodplain Documents
>
Backfile
>
4001-5000
>
FLOOD04928
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2010 10:11:55 AM
Creation date
10/5/2006 1:07:53 AM
Metadata
Fields
Template:
Floodplain Documents
County
Denver
Jefferson
Community
Denver, Edgewater, Lakewood, Wheatridge
Stream Name
Sloans Lake Basin
Basin
South Platte
Title
Major Drainageway Planning
Date
12/1/1977
Prepared For
Denver / Lakewood
Prepared By
UDFCD
Contract/PO #
&&
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />I <br /> <br />Per cent of imperviousness was determined by measuring impervious <br /> <br /> <br />surface areas of eight sample street blocks throughout the basin. <br /> <br /> <br />The selected blocks were judged to be typical of fully developed <br /> <br /> <br />representative areas for the various sub-basins. Field visits veri- <br /> <br />fied the development characteristics of the sample blocks. <br /> <br />After evaluation of the soil characteristics, infiltration rate and <br /> <br /> <br />pervious runoff, the following hydrological factors were selected and <br /> <br />used in the computation of storm hydrographs: <br /> <br />I <br /> <br />I <br /> <br />Soil Infiltration <br /> <br />I <br /> <br />The coefficients used in the computation of the unit hydrographs, Ct <br /> <br /> <br />(coefficient reflecting time to peak) and C (coefficient related to <br />p <br /> <br />peak rate of runoff) were determined and adjusted in accordance with <br /> <br />the procedure contained in the USDCM. <br /> <br />First 1/2 Hour <br /> <br />5-year Return Period 1 inch/hour <br />10-year to 100-year Return 0.5 inch/hour <br />Impervious Depression and Dentntion Storage: <br />Pervious Depression and Detention Storage: <br /> <br />Remainder of Storm <br /> <br />0.5 inch/hour <br />0.5 inch/hour <br />0.1 inches <br />0.3 inches <br /> <br />I <br /> <br />HYDROGRAPHS <br /> <br />I <br /> <br />Table 1 lists the information developed for the various parameters <br /> <br /> <br />associated with the Sloans Lake basin hydrologic investigation, based <br /> <br /> <br />on a totally developed study area. <br /> <br />I <br /> <br />DESIGN RAINFALL <br /> <br />Design storm hydrographs were computed at each of the design points <br /> <br /> <br />(except for Point A) for the four storm frequencies (5-, 10-, 25- and <br /> <br /> <br />100-year) under consideration for the projected total development con- <br /> <br /> <br />dition. These hydrographs, developed in accordance with the Colorado <br /> <br />I <br /> <br />I <br /> <br />That portion (about 60%) of the Sloans Lake Drainage Basin lying <br /> <br /> <br />north of Colfax Avenue and west of Sheridan Boulevard is located in <br /> <br /> <br />Township 3 South, Range 69 West (Jefferson County). That portion <br /> <br /> <br />(about 35 per cent) of the Basin lying north of Colfax and east of <br /> <br /> <br />Sheridan is in Township 3 South, Range 68 West (Denver County). A <br /> <br /> <br />very small portion (about 5 %) lies south of Colfax Avenue and is in <br /> <br /> <br />Township 4 South, Ranges 68 and 69 West. The design rainfall presented <br /> <br /> <br />in the Rainfall/Runoff Information Report published under Project REUSE <br /> <br /> <br />for these townships and ranges varies insignificantly. The values for <br /> <br /> <br />Jefferson County are generally slightly higher and were the values <br /> <br /> <br />used for runoff computations in the Sloans Lake Basin hydrologic in- <br /> <br /> <br />vestigation. These data are presented in Tables B-1 and B-2 of <br /> <br /> <br />Appendix B. The depths and durations for the four design rainfalls <br /> <br /> <br />(5-, 10-, 25- and lOO-year) are presented in Tables B-3 through B-8 <br /> <br />of Appendix B. <br /> <br />Urban Hydrogr<1ph procedure were used to determine peak des iqn flows <br /> <br /> <br />for each sub-basin and design point within the study area. Graphical <br /> <br /> <br />illustrations of these hydrographs are presented in Figures B-1 through <br /> <br />B-15 in Appendix B. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />Hydrographs at the Colfax Avenue/Federal Boulevard interchange (Sub- <br /> <br />basin A) were not developed due to the lack of any drainageway point- <br /> <br />of-concentration for runoff flows. Peak flows in Sub-basin A were <br /> <br />approximated by summing the Sub-basin Al flow and that portion of flow <br /> <br />from Sub-basins A2b and A3 which is diverted to Sub-basin A. Two <br /> <br />assumptions inherent to this procedure included: <br /> <br />l. The peak flows from the contributory sub-basins (AI, A2b <br />and A3) occur at approximately the same time; <br /> <br />2. The local rainfall in the immediate vicinity of the inter- <br />change is small in comparison to the tributary inflow. <br /> <br />A summary of the peak flows at each of the design points for each fre- <br /> <br />quency is presented in Table 2. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.