Laserfiche WebLink
<br />Atl.ilch copy of either II public notice distributed by the community stating the community's intent to revise the <br />floodway or a statement by the community that it hilS notified all affected property owners llnd affected lldjaccnt <br />jurisdictions. <br /> <br />9. Does the Sl.ilte havejurisdiclion over the lioodway or its adoption by communities participllting in the N~'lp? <br />DYes ~!'\() <br />If yes, attach a copy of a letter notifying the appropriate Sl.ilte agency of the noodway revision and documenl.iltion of the <br />llpproval of the revised noodway by thc llppropriatc Stale agency. <br /> <br />3. PROPOSEO ENCROACHMENTS <br /> <br />10. With floodways: <br /> <br />1 A. Does the revision request involve fill, new construction, substantial impro~ement. or other development <br />in the floodway? DYes Il9 No <br /> <br />lB. If yes, does the development caUSe lhe I OO-year waler surface elevation to increllse at any iocation b)' more <br />than 0.000 feel? 0 Yes D No <br /> <br />II. Without noodways: <br /> <br />2A. Does lhe revision request involve fill, new construction, substanlial improvement, or other development in <br />the IOO-yearnoodplain? J[J Yes C No <br /> <br />28. If yes, does the cumulative effect of all development that has occurn'Cl since the effective SFHA was <br />originally identified Clluse the IOO-year water surface elevation t.o increase at any location by more than <br />one foot (or other surcharge limit if community or state has adopted morestringent criterial? DYes J[lJNo <br /> <br />If the answer t.o either Items 1 B or 2B is yes, please provide documentation that all requirements of Section 65.12 of the <br />NFIP regulations have been met, regarding evaluation of alternatives, notice t.o individual legal property owners, <br />concurrence of CEO, and certification that no insurable structures are impacted. <br />4. REVISION REQUESTOR ACKNOWLEDGMENT <br /> <br />12. Having read NFIP Regulations, 44 CFR Ch.l, parts 59, 60, 61, and 72,1 believe that the proposed revision ~. is <br />o is not In compliance with the requirements of the aforementioned NFIP Regulations. <. <br /> <br />5. COMMUNITY OfFIOAL ACKNOWLEDGMENT <br /> <br />13. <br /> <br />Was this revision request reviewed bx..the community for compliance with the community's lldopted floodplain <br />managementordinanccs? IX! Yes UNo <br /> <br />Does this revision request have the endorsement of the community? aYes 0 No <br /> <br />14. <br /> <br />Uno to either of the above questions, please explain: . ---.-. <br /> <br />Please note that community acknowledgment and lor notification is required for all requests as outlined in Section 65.4 <br />(b) of the NFIP Regulations. <br /> <br />6. OPERATION AND MAINTENANO <br /> <br />15. Does the physical change involve a flood control structure (e.g.,levees,noodwalls, channelization, basins, dllms)? <br />DYes I[) No < <br /> <br />If yes, please provide the following information for each of the new nood control structures: <br /> <br />A. Inspection of the flood control project will be conducted periodically by <br /> <br />with a maximum interval of <br /> <br />ent.lty <br />months between inspections. <br /> <br />B. Based on the results of scheduled periodic inspections, appropriate maintenance of the nood control facilities <br />will be conducted by <br /> <br />(entity) <br /> <br />to ensure the integrity and degree offlood protection.ofthe structure. <br /> <br />C. A formal plan of operation, including documenl.iltion of the flood warning system, specific actions and <br />assignmentsofreaponsibility by individual name or title, and provisions for testing the plan at intervals <br />not le88 than one year, 0 has 0 has not been prepared for the flood control structure. <br /> <br />....ision Requestor and Community Offic;.1 Form <br /> <br />MT.2 Form 1 <br /> <br />Page 2 014 <br /> <br />