Laserfiche WebLink
<br />-, -- <br />....,~'..__._..r <br /> <br />. .-- <br /> <br />, <br /> <br />r <br />11: <br />i <br />)' <br /> <br />.i' <br /> <br />it <br /> <br />. <br />,jj,; <br /> <br />',', <br /> <br />, '.~ <br /> <br />'>1 <br /> <br />'" <br /> <br />\ <br /> <br />I <br /> <br />"'"' <br /> <br />... <br /> <br />. <br /> <br />" <br /> <br />&l..n ..i c..0 /)) aA:). .I-.I.:i <br />e:~,d:."- <br />o ra~~W7 <br /> <br />JUN 18 1984 <br /> <br />~ <br /> <br /> <br />COLORADO WATER <br />CONSERVATION BOARD <br /> <br />TOWN OF OAK CREEK <br /> <br />June 9, 1984 <br /> <br />'!en BoIotlss <br />State of Colorado <br />Div. of Disaster Emergency Services <br />"Camp George West <br />Golden, Co. 80401 <br /> <br />-'0 <br /> <br />,-': ',,'j;'" , <br /> <br />,; <br /> <br />Dear !en, <br /> <br />;cl;.';nlt?:. <br /> <br />.'This letter is, to confirm our telephOne conversation yesterctairegard- <br />ing reconstruction CX)5ts as a result of the flooding of Oak Creek and ' <br />heavy spring runoff. <br /> <br />As you knaN , we need to repair the water supply pipe fram the reser- <br />'voir 'site to the water treatrrent plant. We also have decided not to,' <br />replace i:h.Ei reservoir at this time. . Instead, we are going to can- ' <br />struct a pipe diversion off Oak Creek into two settling ponds; 'Ihe <br />, water would then be piped fram,these ponds to our water treatrrerit <br />'plant. 'This rrethod is the rrost CX)5t-effective and could be accamp- <br />'lished at our present reservoir site. <br /> <br />Since the settling ponds will only hold about ane and a half acre <br />feet of water, we will have to rely on .storedwater in Sheriff's Re- <br />servoir when oak Creek drops to a lew level in the late s= lTa1t:hS <br />a'1.d possibly part of the fall and wi...nter. 'The water from Sheriff's <br />is diverted to oak Creek fram ~out Creek through a ditcl1we call <br />RiCh Ditch. In order to rriake our sUpply fram Sheriff's reliable I we <br />will have to do sore maintenance an Rich Ditch and construct a con- <br />crete headgat.eat ~out" Creek.. <br /> <br />, . I <br />'!he other flOod related water cost we will have is to replace the <br />water rnain that runs under Oak Creek. at Sharp Avenue. ,'This line needs <br />to be lavered and shut off valves should be placed an each side of tiE <br />creek . <br /> <br />'Ihe estimates for the above projects are listed belew. I am sure you <br />realize "that these are only estinates at this point and tiIre and could <br />change" as we proceed with the work.. <br />