Laserfiche WebLink
<br />.~ <br /> <br />, <br /> <br />FLOOD RELATED COST ESTIMATES <br /> <br />Employee Labor <br /> <br />Public Works Foreman <br />Ivorker III <br />Worker 112 <br />Worker 113 <br />Worker 114 <br /> <br />100 hrs. overtime <br />65 hrs. overtime <br />75 hrs. overtime <br />7 hrs. overtime per day <br /> <br />$1540/mo. <br />1400/mo. <br />11 OO/mo. <br />11 aD/mo. <br />1100/mo. <br /> <br />Contracted Equipment, Labor <br /> <br />Loader, dump truck, operator (hauling sand, constructing berms) <br />Dump truck (hauling sand) <br />Track-hoe <br />Welding - equipment, materials, labor <br /> <br />$1200 <br />1000 <br /> <br />1200 <br /> <br />Rebuild Projects <br /> <br />Culverts <br />"He'servoir <br />Sewer plant pumps(repair) <br />Engineering Services <br /> <br />$200,000 <br />400,000 <br />2,000 <br />unknown <br /> <br />fl i see 11 an eou s <br /> <br />Long-distance calls <br />Postage Cost (errergency mailing to residents) <br />Pick-up transfer case <br />Sand bags (160 only) <br />Gas, oil (for vehicle, equipment, pumps) <br />Sand (one load) <br /> <br />400 <br />100 <br />800 <br />65 <br />1400 <br />40 <br /> <br />Anticipated Needs <br /> <br />Radio Communication (pack-sets, base station) <br /> <br />5.000+ <br /> <br />Donated Miscellaneous <br /> <br />Portable Toilets <br />Temporary Bridge <br />Sand bags (12,000) <br />Loader <br />Engineering Services (immediate need) <br />Food, Ivater <br /> <br />$2100 <br />40,000 <br />4,560 <br /> <br />~ <br /> <br />,~' <br />