My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD04769
CWCB
>
Floodplain Documents
>
Backfile
>
4001-5000
>
FLOOD04769
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:47:11 PM
Creation date
10/5/2006 12:56:34 AM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
State of Colorado
Stream Name
All
Basin
Statewide
Title
Design and Construction of Levees
Date
3/31/1978
Prepared For
Army
Prepared By
US Army Corps of Engineers
Floodplain - Doc Type
Educational/Technical/Reference Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />Sub,j ect <br /> <br />Section II. Stability Analyses <br />Methods of Analysis---------------------- <br />Conditions Re~uiring Analysis------------ <br />Minimum Acceptable Factors of Safety----- <br />Measures to Increase Stability----------- <br />Surface Slides--------------------------- <br />Section III. Settlement <br />General---------------------------------- <br />Settlement Analyses---------------------- <br /> <br />CHAPTER 7. LEVEE CONSTRUCTION <br /> <br />Section I. Levee Construction Methods <br />Classification of Methods---------------- <br />Section II, Foundations <br />Foundation Preparation and Treatment----- <br />Methods of Improving Stability----------- <br />Section III, Embankments <br />Embankment Construction Control---------- <br />Embankment Zoning------------------------ <br />Protection of Riverside Slopes----------- <br /> <br />. <br /> <br />CHAPTER 8. <br /> <br />SPECIAL FEATURES <br /> <br />Section I. Pipelines and other Utility Lines <br />Crossing Levees <br />General Considerations------------------- <br />General Considerations for Pipelines <br />Crossing Through or Under Levees------- <br />General Considerations for Pipelines <br />Crossing over Levees------------------- <br />Pipe Selection--------------------------- <br />Antiseepage Devices---------------------- <br />Closure Devices-------------------------- <br />Camber----------------------------------- <br />Installation Re~uirements---------------- <br />Section II. Access Roads and Ramps <br />Access Roads----------------------------- <br />Ramps------------------------------------ <br />Section III. Levee Enlargements <br />General---------------------------------- <br />Earth-Levee Enlargement------------------ <br />Floodwall-Levee Enlargement-------------- <br /> <br />iii <br /> <br />. <br /> <br />',':' t._~'~-,t.t'-",;,.~r; t ~~_;: <br /> <br />EM 1110-2-1913 <br />31 Mar 78 <br /> <br />Paragraph Page <br /> <br />6-4 <br />6-5 <br />6-6 <br />6-7 <br />6-8 <br /> <br />6-5 <br />6-5 <br />6-7 <br />6-7 <br />6-8 <br /> <br />6-9 <br />6-10 <br /> <br />6-8 <br />6-9 <br /> <br />7-1 7-1 <br />7-2 7-1 <br />7-3 7-4 <br />7-4 7-7 <br />7-5 7-8 <br />7-6 7-9 <br /> <br />8-1 8-1 <br />8-2 8-2 <br />8-3 8-4 <br />8-4 8-4 <br />8-5 8-7 <br />8-6 8-8 <br />8-7 8-9 <br />8-8 8-9 <br />8-9 8-11 <br />8-10 8-12 <br />8-11 8-14 <br />8-12 8-14 <br />8-13 8-16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.