Laserfiche WebLink
<br />PLANNED REPORTS <br /> <br />Several potential reports describing various activities in the project are <br />discussed below. <br /> <br />Annual progress reports.--An annual progress report could be prepared at the <br />end of each water year. These reports will describe project activities for the <br />preceding year, planned activities for the forthcoming year, and could summarize <br />availability of project data which can be obtained by request. <br /> <br />Technical journal articles.--Technical journal articles summarizing the <br />feasibility of using geomorphic and botanic data to aid in determining flood <br />frequency in foothill areas could be written if the studies result in conclusive <br />results. The articles would contain preliminary study results and proposals for <br />expanding geomorphic and botanic studies into other foothill basins. <br /> <br />Summary report.--Results of the research study of flood records for foothill <br />streams could be published as Part A of a two-part summary report. The research <br />study of flood-information transfer techniques for foothill basins could be <br />published as Part B. Preparation of both parts will be started during 1979, with <br />anticipated publication during 1981. <br /> <br />Data Reports.--Streamflow and rainfall data could be compiled and released at <br />3- to 5-year intervals. <br /> <br />PROJECT BUDGET <br /> <br />The project budget for <br />subsequent years covering <br />below. <br /> <br />fiscal years 1978-79 and the proposed budget for <br />research and the data-collection network is itemized <br /> <br />Fiscal year <br /> <br />Resea rch Data network Total <br />$ 80,400 $ 11,100 $ 91,500 <br />57,000 19,000 76,000 <br />1100,000 260,000 160,000 <br />60,000 2100,000 160,000 <br /> 2160,000 160,000 <br /> 120,000 120,000 <br /> 120,000 120,000 <br /> <br />1978 <br />1979 <br />1980 <br />1981 <br />1982 <br />1983 <br />Subsequent <br /> <br />Iprojected funds based on assumed feasibility of geomorphic and botanic <br />research. <br />2projected funds based on establishment of the streamflow and rain-gage net- <br />work during 1980-82. <br /> <br />24 <br />