Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />almOIfHREE <br /> <br /> <br />Greelev <br /> <br />3,3.2 Inundation Limits <br /> <br />Three-foOl deep water was reported in some areas of Greeley. The reported areas oftlooding are <br />illustrated on Figure 3.1-2, <br /> <br />3,3.3 Unique Circumstances Affecting Flooding <br /> <br />The Number 3 Ditch, which runs through the center of Greeley, ran out of its banks, Clogged <br />storm sewer inlets contributed to the damage at the school administration oft\ces, <br /> <br />3.4 FLOOD DAMAGES <br /> <br />Major flooding occurred throughout Greeley during this event. Damage included several <br />flooded basements (among them City Hall), stranded motorists due to inundated streets, and an <br />electrical outage for approximately 2,300 residents. A NOAA Event Record listed an estimated <br />total of approximately S600,000 in property damages. <br /> <br />3.4,1 Public Property Damage <br /> <br />Flooding occurred at the School District 6 Administration offices, but minimal damage was reported, <br /> <br />Flooding at City Hall (see photographs and news articles in appendices) threatened precious <br />documents and caused approximately 5250,000 in damage including replacement of carpeting and <br />wall panels, <br /> <br />3.4.2 Private Property Damage <br /> <br />The following damages were reported in the Greeley Tribune: <br /> <br />. The roof of Larry's Barber Shop collapsed during the deluge. Costs are unknown, <br /> <br />. The Travelodge motel and restaurant incurred significant costs including $20,000 tor a brand <br />new air conditioner, $4,000 in food, and unknown costs for carpets, boilers, and other <br />expenses, <br /> <br />. Costs at India's Taj Mahal Restaurant included $6,000 in groceries, <br /> <br />3.4.3 Emergency Response, Cleanup, and Repair <br /> <br />Approximately 2,300 homes and businesses in the city suffered electrical outages, Costs <br />associated with the outages were not reported, <br /> <br />URS <br /> <br />T lPQOJEC1S\6e0U888_CWC9JLOOO_OOC...RP1S\SUB30.6 Q_PROJ_OELlV'.REPORf\FINAL REPORT 1 OOC\20-ll.tAR.02'l. 3-4 <br />