My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD04689
CWCB
>
Floodplain Documents
>
Backfile
>
4001-5000
>
FLOOD04689
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:46:58 PM
Creation date
10/5/2006 12:50:49 AM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Basin
Statewide
Title
2001 Colorado Flood Documentation Report: Table of Contents and Sections 1 - 8
Date
3/1/2002
Prepared For
CWCB
Prepared By
URS
Floodplain - Doc Type
Flood Documentation Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />SEe1IDITW 0 <br /> <br /> <br />Colorado Springs <br /> <br />Of these areas, only Interstate 25 can be characterized as an area that was significantly impacted, <br /> <br />2,3.3 Unique Circumstances Affecting Flooding <br /> <br />According to CDOT maintenance supervisor Phil Breesawitz, rainfall was only a contributing <br />factor to the flooding on Interstate 25 at the Bijou Street interchange, The primary cause of <br />flooding was associated with lightning, which hit an electrical pole, causing a loss of electricity <br />and damage to two pumps at a lift station that it is necessary to keep this interchange dry at all <br />times. <br /> <br />The lift station at the Bijou Street Bridge is necessary because the road is below the bed of <br />nearby Monument Creek at this interchange. (This situation will be remedied with the ongoing <br />improvements of Interstate 25,) With the pumps out and concurrent heavy local rainfall, two feet <br />to three feet of water accumulated on the interstate, which was closed for at least seven hours. <br /> <br />2.4 FLOOD DAMAGES <br /> <br />2.4,1 Public Property Damage <br /> <br />Mr. Breesawitz estimated that damage to the lift station pumps and other electrical equipment <br />cost COOT approximately $30,000, <br /> <br />A drop structure construction project in Monument Creek was also damaged during the event. <br />Mr, Thorson estimated that loss of topsoil and other costs to the City were approximately <br />$30,000, <br /> <br />2.4.2 Private Property Damage <br />No private property damage was reported, <br /> <br />2,4.3 Emergency Response, Cleanup, and Repair <br /> <br />COOT personnel spent several hours on site placing portable pumps, pumping the water, and <br />then removing mud and other debris before the interstate could be opened, Mr. Breesawitz <br />estimated equipment usage (a loader and street sweeper), labor costs, and pump rental to total <br />approximately $2,000, <br /> <br />URS <br /> <br />T \PR()'ECTS-"888.CWCBflOOO,OOC.RPTS'.SUB,C'M O,PROJ,OEl"'REPORWINI'1.REPOR' I OOC\2M....R-<l2',' 2-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.