Laserfiche WebLink
<br />I <br />I <br />,I <br />I <br />I <br />I <br />I <br />I <br />,I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />1 <br />I <br />-I <br /> <br />* Condition 2, loo-year South Boulder Creek floodplain with a FEMA certified <br />flood levee in place on the southern and eastern property. <br /> <br />Both Condition I and Condition 2 hydraulic models will be based upon the <br />current Property reclamation grading plans. <br /> <br />C. Prepare a report documenting the findings and floodplain delineations of the <br />impacts ofthe South Boulder Creek floodplain on the Flatiron Property, <br /> <br />PREVIOUS FLOOD STUDIES ON SOUTH BOULDER CREEK <br /> <br />In order to analyze the floodplain conditions at the Property, Love & Associates <br />reviewed several previously documented floodplain studies of South Boulder Creek, <br />Following is a brief history of these earlier studies along with information pertaining to <br />each study's findings, <br /> <br />The earliest study obtained for South Boulder Creek was prepared in August, 1969, by <br />the V,S, Army Corps of Engineers (Corps) entitled Floodplain Information Report for <br />South Boulder Creek. This report published the results of a floodplain analysis for the <br />Intermediate Regional Flood, approximately the lOO-year flood based upon a flood <br />discharge of S,OOO cubic feet per second (cfs) and the Standard Project Flood <br />(approximately Soo-year flood) of 9,400 cfs on South Boulder Creek, Flood profiles <br />were developed from surveyed cross sections and the floodplain was delineated on <br />V.S.G,S, 7 1/2 minute topographic maps with contour intervals of 10 to 40 feet. The <br />floodplain generated during this analysis did not accurately trace the waters resulting <br />from the flow split of South Boulder Creek which leaves the creek's floodplain and spills <br />to the north and east of the Flatiron Property, <br /> <br />The next documented floodplain analysis and master plan for South Boulder Creek was <br />undertaken in December 1973, by R. W. Beck and Associates under a contract with the <br /> <br />-3- <br /> <br />- .;.~" <br />