Laserfiche WebLink
<br />Direet -" "On-site": <br />Skilledlab6r ;. <br />Unskilled labor <br />Other la.bor <br /> <br />18,000 <br />12,000 <br />10,000 <br /> <br /> <br />. <br /> <br />10-02. Man-hours of .employmen~. - Construction of the Pinon Canon <br />Dam would provla-ea.total.'bf-about.' B5,ooo man-hour? of employment wi th <br />40,000 man-hours classified as direct "on-site" labor and 45,000 man- <br />hours as indirect "off":site" .1abor. . ..Thedi1'it:"v'j:bution of. the. mitn.'-hours <br />. -.., """'-,' . ,. '" . . <br />of labor is shown in table 2. . <br /> <br />. "'>.' 1';':..-; <br /> <br />TABLE 2 <br /> <br />. :;'.; ,.ESTIJiIA'VEDAMOUN1' OF. EMPLOYHENT <br /> <br />Type o~ Employment <br /> <br />Man-hours <br /> <br />Total - Direct man-hours <br /> <br />40,000 <br />, 45,000 <br />85,000 <br /> <br />Indirect - "Off-site" <br /> <br />Total - Direet and Indireet <br /> <br />XI - OPERATION AND MAINTENANCE <br /> <br />11-01. Operation and maintenailce. - Maintenance and operation of <br />the project works would be the responsibility of local interests in <br />accordance with regulations prescribed by the Secretary of the Army. <br />This work would eonsist of periodic inspection, cleaning, andmainte- <br />nanee of the struetures. Cost of annual maintenance and operation is <br />estimated at ~>500. <br /> <br />XII - ECONO~iIC STUDIES <br /> <br />.. <br /> <br />12-01. Eeonomie studies. ~ The economic studies prepared for the <br />preliminary reconnaissance report eonsisted principally of a review of <br />the flood damage survey submitted by the eity of Trinidad. Economic <br />studies, including a field investigation of the are~ subject to flood- <br />ing, were made in eonnection with preparation of this project rep~rt <br />in order to determine, (a) the economic conditions in the flood plain, <br />(b) the flood damages experienced, (c) the monetary benefits that would <br />be creditable to the project, and (d) the ratio of project benefits <br />to project costs. An area of about 40 aeres in the northwestern and <br />central sections of the eity, having a property valuation of $1,860,000, <br />would be proteeted. From these studies it was determined that the ratio <br />of benefits to costs for the Pinon Canon Dam project would be 1.29:1. <br />Details of the economic studies are given in appendix III. <br /> <br />.c.. - J.l - <br /> <br />... <br />