My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD04639
CWCB
>
Floodplain Documents
>
Backfile
>
4001-5000
>
FLOOD04639
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:46:50 PM
Creation date
10/5/2006 12:48:08 AM
Metadata
Fields
Template:
Floodplain Documents
County
Las Animas
Community
Trinidad
Stream Name
Pinon Canon Dam
Basin
Arkansas
Title
Pinon canaon Dam Flood Control
Date
10/1/1951
Prepared For
CWCB
Prepared By
COE
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />..1 <br /> <br />, 1-;~ <br /> <br />{'O. <br /> <br />h <br /> <br /> <br />0.7 mile of road relocation would be required. Relocation 6f these <br />facilities from the reservoir area would be accomplished by the city <br />of Trinidad at no expense to the Government. It has been estimated <br />that the cost of these reloeations would amount to about ~9,,5oo. <br />. } l'./. ~ : <br />I." ;: <br />, <I <br /> <br />;., <br /> <br />9-01. Summary. - The estimated total cost of .the Pi!lO; Janon Dam <br />projeet is l~~, '500~ This amount includes direct construction costs <br />and'. itel1,ls :!;Ol' engineering, overhead, contingencies, and. cost's of local <br />d~petation~ Tlte total Feder!9:1cost of the project is $150,000, and <br />the noil-Federal cost is. .$3?,500.' These costs are shown :Ln: detail in <br />table 1. Unit costs and lymp sum prices used in this report 'are based <br />on eurrent. priees for labor and material. <br /> <br />1;: <br /> <br />IX - COST ESTIMATES <br /> <br />'.1: <br /> <br />X - SCHEDULES FORP1&NNING AND CONSTRUCTION;: <br /> <br />10-01;' CCl1structiontime. - The time required to complete con- <br />struction of the < entire project is estimate.d to be 6 months. The <br />proposed construction sehedule showing the sequence of oPeration, the <br />time required for eompletion of the principal items of .lork,. and' an <br />estimate of funds required is presented on plate 5. It is 'proposed <br />to perform the1;1ork by contract. Preparation of cO'"!tradt p;Lans and <br />speci-fica:tions ;'in the District office would require '1, months tirr.e and <br />is est'imated tb.. cost $3,700. ,: . . '" <br /> <br />t,. <br /> <br />,'" <br />"., .t <br /> <br />''''; <br /> <br />;;-;- <br />U <br /> <br />',', <br /> <br />, <br /> <br />.. <br /> <br />, ,; <br /> <br />-7- <br /> <br />'. <br /> <br />'. <br />
The URL can be used to link to this page
Your browser does not support the video tag.