Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Lateral and Drainage Systems. There are 438 miles of laterals which <br />distribute water to project lands. A system of subsurface drains <br />totaling 216 miles has been constructed. <br /> <br />Water is diverted through the Gunnison Tunnel under Gunnison River <br />direct flow rights and/or Taylor Park Reservoir storage rights. This <br />water is distributed as needed through the project canal system. <br />Additionally, the UVWUA holds Uncompahgre River direct flow rights. The <br />water rights associated with each of the project features discussed above <br />are shown in Table B.l <br /> <br /> TABLE B.l <br /> UVWUA Water Rights <br /> Priority <br />Fac i1 itv Source Ouantitv Unit Date Ranae <br />Taylor Park Reservoir Taylor River 111 ,260 af 1904 <br />Gunnison Tunnel Gunnison River/ 1,300 cfs 1901 <br /> Taylor Park Res. <br />M&D Canal Uncompahgre River 627.09 cfs 1882-1888 <br />East Canal Uncompahgre River 85.08 cfs 1882-1888 <br />Ironstone Canal Uncompahgre River 202.22 cfs 1882-1888 <br />Garnet Canal Uncompahgre River 93.33 cfs 1883-1888 <br />Se1 ig Canal Uncompahgre River 86.64 cfs 1883-1888 <br />Loutsenhizer Canal Uncompahgre River 102.83 cfs 1883-1888 <br /> <br />The UVWUA also has entered into an agreement to purchase up to <br />11,200 af of supplemental irrigation water from the Dallas Creek Project. <br />That project is discussed in Section B.2.5, Municipal and Industrial <br />Water Users. <br /> <br />B-12 <br /> <br />f1 r'1""363i'"l <br />tJ kJ v ,,-_J .../ ;7 <br />