My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD04590
CWCB
>
Floodplain Documents
>
Backfile
>
4001-5000
>
FLOOD04590
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:46:41 PM
Creation date
10/5/2006 12:45:20 AM
Metadata
Fields
Template:
Floodplain Documents
County
Larimer
Community
Fort Collins
Basin
South Platte
Title
Ft. Collins Early Warning Systems
Date
8/6/1998
Prepared For
Larimer County
Prepared By
Consultants
Floodplain - Doc Type
Community File
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />2 Performance of all tasks and report writing to complete the Contractor <br /> Executive Summary of the project report Fort Collins <br /> CWCB <br />3 Performance of all tasks and report writing to complete chapter I Contractor <br /> (Problem Description) of the project report Fort Collins <br />4 Performance of all tasks and report writing to complete chapter Contractor <br /> II (Proposed Solutions) of the project report (separate contract) <br /> Fort Collins <br />5 Performance of all tasks and report writing to complete chapter Contractor <br /> III (Description of Proposed Project) of the project report (separate contract) <br /> Fort Collins <br />6 Performance of all tasks and report writing to complete chapter Contractor <br /> IV (Cost Estimate) of the project report (separate contract) <br /> Fort Collins <br />7 Performance of all tasks and report writing to complete chapter Contractor <br /> V (Cost Effectiveness) of the project report Fort Collins <br />8 Performance of all tasks and report writing to complete chapter CWCB <br /> VI (National Flood Insurance Program Information) of the Fort Collins <br /> project report <br />9 Performance of all tasks and report writing to complete chapter Contractor <br /> VII (Environmental Information) of the project report (separate contract) <br />10 Performance of all tasks and report writing to complete chapter Contractor <br /> VIII (Work Schedule) of the project report (separate contract) <br /> Fort Collins <br />11 Performance of all tasks and report writing to complete chap~er Fort Collins <br /> IX (Authorization) of the project report <br />12 Compilation of all text, maps, figures, and drawings for final Contractor <br /> report. Editing and publication of final report. (separate contract) <br /> Fort Collins <br />13 Compilation of all materials and publication of the final Contractor <br /> Appendix (Technical Addendum) of the project report (separate contract) <br /> Fort Collins <br /> 14 Compilation of all materials for the "Summary of Attachments" Contractor <br /> of the project (separate contract) <br /> Fort Collins <br /> 15 Any public meetings or necessary communications with CWCB <br /> residents, local officials, or other interested parties . Fort Collins <br /> <br />Specific portions of Tasks 2, 3 and 7 for the Contractor to complete are outlined below, All <br />work shall meet or exceed FEMA's requirements for HMGP application. Application <br />information will be provided by the CWCB to the Contractor. <br /> <br />Task 2 - Executive Summary <br />The Contractor, in cooperation with the CWCB and the City of Fort Collins, shall prepare a <br />written Executive Summary of the Project Report. The format of the Executive Summary shall <br />be prescribed by the CWCB and shall present, in a clear and concise manner, the information <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.