Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />53 <br /> <br />It will be noted that the total construction cost is estimated at <br />$9,502,700, which includes $2,137,700 for construction contingency, <br />legal, fiscal, and engineering costs of 30 per cent. About $915,400 <br />is allocated to the retent i on bas i ns. I ncome can be rea 1 i zed from <br />material sales from these reservoirs whIch has not beer accounted <br />for in the cost estimates. <br /> <br />The total land acquisition costs are estimated at $219,800, which <br />includes right-of-way costs ranging from $1,000 to $20,000 per acre. <br />No buildings need be taken with the proposed plan. <br /> <br />The costs per mile of the proposed works, excluding the retention <br />basins, are as follows: <br /> <br />Gregory Creek <br />Bluebell Canyon Creek <br />King Gulch <br />Skunk Creek <br />Bear Canyon Creek <br />Viele Channel <br />Anderson Channe I <br />David's Draw <br /> <br />$ 812,200 <br />591,700 <br />552,500 <br />770.700 <br />I ,021 ,900 <br />758,500 <br />286,700 <br />l2,000 <br /> <br />TABLE V I 11-1 <br /> <br />UNIT PRICES <br /> <br />Item <br /> <br />Excavation and disposal in Urban Area <br />Excavation and disposal in Open Area <br />Pond excavation and disposal in Urban Area <br />Pond excavation and disposal in Open Area <br />Rei nforced concrete <br />Slab concrete (European-type channel) <br />Small irrigation ditch lining <br />Bridges <br />Structural excavation <br />Seeding crested wheat <br />Sodding <br />Riprap, plain <br />Riprap, grouted, and gabions <br />Small rock energy dissipating units <br />Fence <br />Pavement and sidewalk, removal and replacement <br />Clearing and snagging <br />Armor plating (avg.) <br />48" Rei nforced Concrete Pipe <br />5411 II II II <br />6011 II II II <br />8411 II II II <br /> <br />Corrugated metal structural plate arch pipe <br />Slope protection <br /> <br />Incidental prices based upon 1968 f2!! Q!!! <br />Department of Highways, State of Colorado. <br /> <br />Unit Cost <br /> <br />$1.50/cu, yd. <br />$1.25/cu. yd. <br />$1 . 25 cu. yd. <br />$1.OO/cu. yd. <br />$1.OO/cu. yd, <br />$60,00/cu. yd. <br />$12.00/1.f. <br />$10. DO/sq. ft. <br />$3.00/cu. yd. <br />$600.00/acre <br />$4,800/acre <br />$15,00/cu. yd. <br />$30.00/cu. yd. <br />$2,000/each <br />$3.00/1 . f . <br />$IO.OO/sq. yd. <br />$5.00/1. f. <br />$12.00/1 . f . <br />$30.00/1. f. <br />$35.00/1.f. <br />$40.00/1. f. <br />$lOO.OO/I.f. <br />$35. to $70/I.f. <br />$lO.OO/sq. yd. <br />