Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />,I <br />I <br /> <br />TABLE OF CONTENTS <br /> <br />LETTER OF TRANSMITTAL <br /> <br />. SECTION <br /> <br />I NTRODUCT I ON , . . . . . <br /> <br />Scope of Work. . . . <br />Problems of the Area <br />Procedure, <br /> <br />II <br /> <br />THE STUDY AREA <br />Past Floods. <br /> <br />III ALTERNATE PLANS <br /> <br />Alternates Studied <br /> <br />IV <br /> <br />HYDRO LOGY. . . <br /> <br />Ra 1 nfa 11 , <br />Design Points, <br />Determination of Design Flows. <br />Special Considerations <br /> <br />V LEGAL ASPECTS, . <br /> <br />VI DESIGN CRITERIA <br /> <br />V II THE MASTER PLAN <br /> <br />Description of Improvements. <br />Special Comments on Channel Planning <br />Flood Detention - Sediment Retention <br />General Notes <br /> <br />VI I I ESTIMATED COSTS. . <br /> <br />IX FINANCING OF DRAINAGE WORKS. <br /> <br />Potential Sources of Funds <br />Potential Use and Magnitude of Funds <br />Organization for Action. . <br />Application of Strategy to Project <br /> <br />x <br /> <br />SUMMARY AND CONCLUSIONS. . . . <br /> <br />Reservoi rs. <br /> <br />PAGE <br /> <br />1 <br />2 <br />2 <br />2 <br /> <br />4 <br />5 <br /> <br />15 <br />16 <br /> <br />22 <br />22 <br />24 <br />24 <br />26 <br /> <br />33 <br /> <br />36 <br /> <br />41 <br />41 <br />45 <br />48 <br />49 <br /> <br />52 <br /> <br />55 <br />56 <br />60 <br />64 <br />67 <br /> <br />68 <br />