Laserfiche WebLink
<br /> <br />We Recommend I ntegroti ng P d io; <br />with Criteria in E cxh Chc::pter <br /> <br /><> Policy repeated in <br />detention chapter <br /> <br />~ Discussion of on-site <br />versus regional <br />storm water detention <br />facility <br /> <br /><> Summary of general <br />requirements and <br />alternatives <br /> <br />B R 0 IV;'; ~ ~ n <br />C ^ I. D W ELL <br /> <br />* Detention system d~signed <br />for 100-year with fut(ire <br />development <br /> <br />~ Decision based on site- <br />specific information; such <br />as ability to provide fong- <br />term maintenance <br /> <br />~ Can improve downstream <br />conveyance to compensate <br />for peak flow increases <br />