Laserfiche WebLink
<br />~ <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Appendilt G. Cost Estimates. <br /> <br />42. A review of the unit cost indicare the following chaages maybe necessary. <br /> <br />I. Project constrUc:tion will most likely require some dewateriDg to obtain an adequate <br />foundation. Please Include this costs. <br /> <br />b. Each unit COSllppears to be 30 to SO percenllow. This may be due to subcollttlCtor <br />mark-ups thllt we... not included or difTerillg typfs or cODStnlction. etc. PleallC verify tbc unit <br />cost with possible quores from contractor. Tbc same contractor used for the HamblllJ Bend <br />project can be used for this work. <br /> <br />c. Use a 2S percellt contingency rather than 20 pcrc.cnl. <br /> <br />43. Plate 2. To reduce seepaic through the sill strUcture, please incorporate an impervious core <br />or similar mechanism into the cross section. <br /> <br />s <br />