My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD04543
CWCB
>
Floodplain Documents
>
Backfile
>
4001-5000
>
FLOOD04543
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:46:33 PM
Creation date
10/5/2006 12:44:04 AM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
Harrison County, Iowa
Basin
Statewide
Title
California Bend Missouri River Fish and Wildlife Mitigation
Date
11/1/1994
Prepared For
US Army Corps of Engineers
Prepared By
Greenhorne & O'Mara, Inc.
Floodplain - Doc Type
Data (general)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />II <br />I <br />I <br />I <br />I <br />I <br />I <br />I.~ <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />22. Paee 38. add "wilh available data." to the end of the next to last seDtetlCe in ptl'llifaph Ill. <br />23. Page 39, rust line, please eltpand OD what is meant by "periodic drec1glna and/or <br />cltcavatlon" . <br /> <br />24. Page 39. second full parapph, 1st sentence, plwc cbange "PlaDs and SpecifICations" to <br />"ConstrUCtion" . <br /> <br />2S. P-llC 39, ~tion 12 and Table 8, the E&D and S&1 costS are $159,000 aad $3!i,ono <br />respectively. <br /> <br />26. Page 41, Table 9, Implementation Schedule. See attaChed muted up table. <br /> <br />27. Page 44. CbaD&C "Rich4rcl Oonon" to "Robert Nebel". Add "C.mdaee Thoma.<. Study <br />Manager, Environmental Resources Specialist, Omaha District." DeIete"Beclc:y Latka". Mick <br />'Sadine" should be "Sandine". Delete the SlUdy Manager responsibility for John Remus' duties. <br /> <br />28. Page 47. Delete "CONSIDERATIONS" from the title oCthis page. First paragraph needs <br />to compare the environmental impacts of the selected plan to those of the other alternatives. <br />Needs to show that !he selected plan is the least enviromnentally damaging. <br /> <br />29. Page 47. Paragraph La. Discuss that the amount ot fill involved lias been Jnlnl1nl,..ed to <br />the extent practical. Paragraph l.b. Discuss that other sites would also involve placement of <br />fill material. <br /> <br />30. Page 52. Change "Richard Oorton" to "Robert S. Nebel". Also,Deed to acid I statement <br />that, based on consideration of the factors discusse4, the proposed discbarae complies with the <br />guidelines. <br /> <br />31. Page 55. OPPD should be Omaha Public Power District. Also, "Hesse ct. aJ" (three of <br />them) netd to be properly cited, with the names of all authors. <br /> <br />Volume IT <br /> <br />Appendix C. Hydraulic Analysis. <br /> <br />32. HEC-2 Modeling - The reach of river mOdeled Is Inadequate. The HEC.2 model staIU at <br />the downstream end of the project. How were starting water surface elevations determined or <br />known? Figure S indi<'.alf!~ a ereat variation in slope. 'The model should be started several miles <br />downstream $0 that uncertainties in the starting water surface are roinim;".cd by the time the <br />project area is reached (promes are more likely to attain the "normal" depth in the project area). <br />Otherwise. it could lead to errors of 0..5 feeL or llllJre GudgiDg by r:~ S). Our records <br />indicate that the data set we provided started at river mile 644.7 and extended to river mile <br />660 0 Plea~ extend the model downstream. <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.