Laserfiche WebLink
<br />I <br /> <br />I <br />1 <br /> <br />42a. Dewatering will be added to the construction cost as requested. <br /> <br />1 <br /> <br />42b. The unit costs were obtained from conversations with contractors, as well as <br />cost estimate data obtained from similar projects. The unit costs are <br />consistent with the Hamburg Bend proj ect. Please indicate if unit costs <br />should be adjusted per your comments. <br /> <br />42c. We will use 25 percent contingency rather than 20 percent as requested. <br /> <br />1 <br /> <br />43. The sill structure detail on Plate 2 will be modified for seepage reduction <br />as requested. <br /> <br />1 <br /> <br />I <br /> <br />I <br /> <br />1 <br /> <br />I' <br /> <br />I <br /> <br />1 <br /> <br />1 <br /> <br />I <br /> <br />1 <br /> <br />1 <br /> <br />I <br /> <br />I <br /> <br />I <br />