Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />TABLE 1 <br /> <br />Drainage and Flood Control Feasibility Study <br />West Willow Creek above Creede, Colorado <br />Project Cost Estimate <br />October 1996 <br />Item Unit Unit Cost Quantity Cost <br />1. Mobilization LS $2,500 1 $2,500 <br />2. Excavation CY $10 175 $1,750 <br />3. Concrete Trapezoidal Overflow Channel CY $250 20 $5,000 <br />4. Stabilize downstream face of tailings pile LS $3,500 1 $3,500 <br />5. Remove debris/loose timber LS $600 1 $600 <br /> Subtotal $13,350 <br /> 10% Contingency $1,335 <br /> Subtotal Construction Cost $14,685 <br /> CWCS Feasibility Study $5,000 <br /> Surveys and Mapping $2,000 <br /> Engineering Final Design $5,000 <br /> 10% Administration and Inspection $1 ,469 <br /> Total Project Cost $28,154 <br />