Laserfiche WebLink
<br />- ; <br />I <br /> <br />, <br />. <br /> <br />2 <br /> <br />The table below indicates the modified BFEs for several locations along the affected lengths of <br /> <br />Cressmans Gulch and Cressmans Gulch Old ChanneL <br /> <br />Location <br /> <br />Existing BFE <br />(feet) * <br /> <br />Modified BFE <br />(feet) * <br /> <br />Cressmans Gulch: <br />Approximately 250 feet upstream of <br />confluence with Tucker Gulch <br />Approximately 100 feet upstream of Wyoming Street <br />Approximately 320 feet upstream of Wyoming Street <br /> <br />5,849 <br />5,929 <br />5,940 <br /> <br />5,849 <br />5,924 <br />5,934 <br /> <br />Cressmans Gulch Old Channel: <br />Approximately 100 feet upstream of <br />confluence with Cressmans Gulch <br />Approximately 200 feet upstream of <br />confluence with Cressmans Gulch <br /> <br />5,914 <br /> <br />5,927 <br /> <br />5,929 <br /> <br />5,929 <br /> <br />*National Geodetic Vertical Datum, rounded to nearest whole foot <br /> <br />Under the above-mentioned Acts of 1968 and 1973, the Mitigation Directorate must develop <br /> <br />criteria for floodplain management. For the community to participate in the National Flood Insurance <br /> <br />Program (NFIP), the community must use the modified BFEs to administer the floodplain management <br /> <br />measures of the NFIP. These modified BFEs will also be used to calculate the appropriate flood <br /> <br />insurance premium rates .for new buildings and their contents and for the second layer of insurance on <br /> <br />existing buildings and contents. <br /> <br />Upon the second publication of notice of these changes in this newspaper, any person has 90 days <br /> <br />in which he or she can request, through the Chief Executive Officer of the community, that the Mitigation <br /> <br />Directorate reconsider the determination. Any request for reconsideration must be based on knowledge <br /> <br />of changed conditions or new scientific or technical data. All interested parties are on notice that until <br /> <br />the 90-day period elapses, the Mitigation Directorate' s determination to modify the BFEs may itself be <br /> <br />changed, <br />