Laserfiche WebLink
<br />2 <br /> <br />The proposed Pawnee Creek Overflow Interceptor Channel will intercept all base flood discharges from <br />south of the proposed channel. As a result, all SFHAs north of the proposed Pawnee Creek Overflow <br />Interceptor Channel that previously resulted from the Pawnee Creek Overflow will be redesignated <br />Zone X (shaded), areas that would be inundated by the flood having a O.2-percent chance of being <br />equaled or exceeded in any given year. <br /> <br />Upon completion of the project, your community may submit the data listed below and request that we <br />make a final determination on revising the effective FIRM and FIS report. <br /> <br />. Because the proposed Pawnee Creek Overflow Interceptor Channel is designed to convey the <br />entire base flood discharge in the channel, please address during final design the potential for <br />erosion ofthe channel lining and specifically, areas on the south side slopes where floodwaters <br />would enter the channel. <br /> <br />. Detailed application and certification forms, which were used in processing this request, must be <br />used for requesting final revisions to the maps. Therefore, when the map revision request for the <br />area covered by this letter is submitted, Form I, entitled "Revision Requester and Community <br />Official Form," must be included, (A copy of this form is enclosed.) <br /> <br />. The detailed application and certification forms listed below may be required if as-built <br />conditions differ from the preliminary plans, If required, please submit new forms (copies of <br />which are enclosed) or annotated copies of the previously submitted forms showing the revised <br />information. <br /> <br />Form 4, entitled "Riverine Hydraulic Analysis Form" <br /> <br />Form 5, entitled "Riverine/Coastal Mapping Form" <br /> <br />Form 6, entitled "Channelization Form" <br /> <br />Form 7, entitled "Bridge/Culvert Form" <br /> <br />. As-built plans, certified by a registered professional engineer, of all proposed project elements <br /> <br />. Hydraulic analyses, for as.built conditions, of the base flood if they differ from the proposed <br />conditions models <br /> <br />After receiving appropriate documentation to show that the project has been completed, FEMA will <br />initiate a revision to the FIRM and FIS report. <br /> <br />The basis of this CLOMR is, in whole or in part, a channel-modification/bridge project. NFIP <br />regulations, as cited in Paragraph 60.3(b)(7), require that communities assure that the flood-carrying <br />capacity within the altered or relocated portion of any watercourse is maintained. This provision is <br />incorporated into your community's existing floodplain management regulations, Consequently, the <br />ultimate responsibility for maintenance of the modified channel and bridges rests with your community. <br />