Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> Table 6: Langdon Bend Project <br />Missouri River Fish and Wildlife Mitigation <br />Alternative Evaluation Scoring Table <br />EVALUATION CRITERIA ALTERNATIVES <br /> A A A B C D <br /> 10' 25' 50' <br /> Pilot Pilot Pilot <br />Construction Cost 6 5 4 0 8 10 <br />Total Acres of Wetlands (existing + 0 0 0 10 I 1 <br />proposed) <br />Total Acres of Chute Created 10 10 10 0 0 0 <br />Taxing Agency Impacts 10 10 10 10 10 10 <br />Project Life 10 10 10 8 3 NIA <br />Average Annual O&M Cost 2 2 2 0 10 NIA <br />Probability of Success 10 10 10 9 5 NIA <br />Navigation Impacts 10 10 10 10 10 10 <br />Fish and Wildlife Benefits 10 10 10 9 5 4 <br />Social Impacts 10 10 10 10 10 10 <br />Totals 78 77 76 66 62 45 <br /> <br />Note: Criteria are evaluated on a 0 to 10 basis, with the higher rating best meeting the project goals. <br />See Appendix D for more detailed information. <br /> <br /> Table 7: Langdon Bend Project <br /> Comparison of Costs for Alternatives <br />Alternative Construction Cost Annual O&M · <br />A - 10 ft, $2,843,995 $25,320 <br />A .25 ft. $3,098,938 $25,320 <br />A.50ft. $3.540.892 $25,320 <br />B $6,276,284 $29,480 <br />C $1.204,064 $13,080 <br />n "" ~ <br /> <br />. Note: Does not include monitonng and evaluation plan costs whicb are estImated <br />to be $4,000 per year for the first, third, and fifth years of the project. <br /> <br />32 <br />