My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD04442
CWCB
>
Floodplain Documents
>
Backfile
>
4001-5000
>
FLOOD04442
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:46:14 PM
Creation date
10/5/2006 12:40:43 AM
Metadata
Fields
Template:
Floodplain Documents
County
Boulder
Community
Longmont
Stream Name
Lefthand Creek
Basin
South Platte
Title
LOMR - Affected Panel 08013C 0269 F - Case No. 97-08-394P
Date
5/14/1999
Prepared For
Longmont
Prepared By
FEMA
Floodplain - Doc Type
Historic FEMA Regulatory Floodplain Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />r <br /> <br />3 <br /> <br />A Consultation Coordination Officer (CCO) has been designated to assist your community. The CCO will <br />be the primary liaison between your community and FEMA. For information regarding your CCO, please <br />contact: <br /> <br />Mr. Steve L. Olsen <br />Director, Mitigation Division <br />Federal Emergency Management Agency, Region VIII <br />Denver Federal Center, Building 710, Box 25267 <br />Denver, Colorado 80225-0267 <br />(303) 235-4830 <br /> <br />FEMA makes flood insurance available in participating commumtles; in addition, we encourage <br />communities to develop their own loss reduction and prevention programs. Our Project Impact initiative, <br />developed by FEMA Director James Lee Witt, seeks to focus the energy of businesses, citizens, and <br />communities in the United States on the importance of reducing their susceptibility to the impact of all <br />natural disasters, including floods, hurricanes, severe storms, earthquakes, and wildfires. Natural hazard <br />mitigation is most effective when it is planned for and implemented at the local level, by the entities who <br />are most knowledgeable of local conditions and whose economic stability and safety are at stake. For your <br />information, we are enclosing a Project Impact Fact Sheet. For additional information on Project Impact, <br />please visit our Web site at www.fema.gov. <br /> <br />If you have any questions regarding floodplain management regulations for your community or the NFIP <br />in general, please contact the CCO for your community at the telephone number cited above. If you have <br />any technical questions regarding this LOMR, please contact Ms. Sally Magee of our staff in Washington, <br />DC, either by telephone at (202) 646-8242 or by facsimile at (202) 646-4596. <br /> <br />Sincerely, <br /> <br /> <br />Sally . agee, Project Engineer <br />Hazards Study Branch <br />Mitigation Directorate <br /> <br />For: Matthew B. Miller, P.E., Chief <br />Hazards Study Branch <br />Mitigation Directorate <br /> <br />Enclosure( s) <br /> <br />cc: The Honorable Ron Stewart <br />Chairman, Boulder County <br />Board of Commissioners <br /> <br />Mr. L. Scott Tucker <br />Executive Director <br />Urban Drainage & Flood Control District <br /> <br />Mr. David Hollingsworth <br />Drainage Engineer <br />City of Longmont <br /> <br />Mr. Steven G. Smith, P.E. <br />Project Engineer <br />QCI Development Services Group, Inc. <br /> <br />Mr. Curt Parker <br />Flood Plain Administrator <br />Boulder County <br /> <br />Mr. Peter Swift, P.E. <br />Project Manager <br />Swift and Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.