My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD04440
CWCB
>
Floodplain Documents
>
Backfile
>
4001-5000
>
FLOOD04440
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:46:14 PM
Creation date
10/5/2006 12:39:40 AM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
All
Stream Name
All
Basin
Statewide
Title
Colorado Flood Map Modernization Business Case Plan - March 2004
Date
3/1/2004
Prepared For
FEMA
Prepared By
CWCB
Floodplain - Doc Type
Floodplain Report/Masterplan
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />SECTIONFOUR <br /> <br />Performance Goals <br /> <br />federal cost matching for federal grants totaling up to about $4,000,000 per year (total budge of <br />$5 million per year) and will continue to work with local communities in an effort to obtain <br />additional cash matches and in-kind services. <br /> <br />Element 4 (Funding Through CTPs) - Goal 4 appears to be directed to FEMA Regional'~ <br />personnel. However, the CWCB stands ready to assist in this regard and is willing, able, and <br />eager to be an active CTP with FEMA to help Region VIII achieve this objective. This Plan is <br />intended to demonstrate the CWCB's ability to succeed as a CTP for the region. Because <br />Colorado represents approximately half of the population of Region VIII, we strongly believe <br />that success in Colorado will largely dictate the success of the region as a whole! <br /> <br />4.2 IMPLEMENTATION PLAN <br /> <br />This section details a proposed plan for performing DFIRM updates to achieve the targets in <br />Element 1 above. Given the projected shortfall if current funding levels are continued, a plan <br />that is based on current funding levels and that claims to meet the FEMA performance goals is a <br />plan that is guaranteed to fail. In and effort to avoid such failure, the CWCB presents below a <br />schedule that could be achieved, but only with an increase in funding levels beyond current <br />levels. The schedule includes the identification of potential obstacles and shortcomings. Note <br />that one of the CWCB's goals is to provide new flood hazard data to residents that need it; <br />therefore Site Specific Mapping updates (H&H needs) have been included in the projected <br />schedule. A summary of the work that can be performed for each level of funding is listed in <br />Section Five below. <br /> <br />Colorado Business Case Plan - March 2004 <br /> <br />4-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.