My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD04440
CWCB
>
Floodplain Documents
>
Backfile
>
4001-5000
>
FLOOD04440
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:46:14 PM
Creation date
10/5/2006 12:39:40 AM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
All
Stream Name
All
Basin
Statewide
Title
Colorado Flood Map Modernization Business Case Plan - March 2004
Date
3/1/2004
Prepared For
FEMA
Prepared By
CWCB
Floodplain - Doc Type
Floodplain Report/Masterplan
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Executive Summary <br /> <br />~! <br /> <br />Colorado's Business Plan at a Glance <br /> <br />./ Expanding Colorado's Current Program - Partnering with FEMA and <br />communities to create an enhanced product for a larger percentage of the public. <br /> <br />,/ Being an Innovator for FEMA - Expanding our role in the NFIP through <br />partnership with FEMA to become a national leader in the industry. <br /> <br />./ Colorado Specific Prioritization Ranking - Accounting for both FEMA <br />performance measures and Coloradoans' concerns. <br />./ Outreach Prior to Contracting to Perform Mapping - Initial Coordination <br />Meetings in counties prior to contracting with FEMA. <br /> <br />./ Integrated Outreach Approach During and After Performance of DFIRM <br />Studies - Cooperative meetings and coordination for every DFIRM study; <br />training and workshops in addition to DFIRM efforts. <br /> <br />../' Full, Medium, Low, and Current Funding Levels - This Plan is weighed <br />against these four funding options. <br />,/ Hiring a Mapping Coordinator - Using FEMA funding, hire a state mapping <br />coordinator ($100,000 per year) to assist with overall program management. <br />,/ Consistency with State Technical Standards - Technical floodplain data to <br />be consistent with ewCB Statewide Drainage Criteria Manual. <br />../' Disseminating Data to End Users - Using the Internet and other tools to <br />provide static ("read-only'') images and interactive flood data to end users. <br />../' Site-Specific Engineering - Recommending new hydrologic and hydraulic <br />analyses where existing data is unavailable or in need of update. <br />,/ Promote Digital Mapping and Eliminate Paper Products- Migrating as <br />quickly as possible away from a paper environment to a digital environment. <br />,/ Active Participation in Map Maintenance - Expanding our roles; working <br />toward in-state processing of PMRs, LOMRs, and CLOMRs. <br /> <br />../' Maintain Current CTP Status in Colorado - FEMA is discouraged from signing <br />CTP agreements in Colorado outside of the eweB and UDFCD to maximize <br />efficiency in meeting goals for Map Modernization. <br /> <br />,/ And of course, In-State DFIRM Production... <br /> <br />..I Using eweB and UDFCD contractors (only through CTP agreements; no IAA or <br />IDIQ contracts) <br />,./ Full cycle DFIRM production (from preliminary maps to GPO deliverables) <br />"' Focus funding.on communities participating in the NFIP <br />,./ Emphasize technical quality <br />o Best available base maps for planimetrics: Local GIS is preferred! <br />o Hydrology that has been approved by the State and Locals <br />o Hydraulics that match highest quality existing topography <br />./ In compliance with eweB Rules and Regulations for designated floodplains. <br />./ High-priority hydrology and hydraulics takes precedence over low priority <br />tountrvwinp DFlRM conVPr!'iion work <br /> <br />Colorado Bu<,in('ss Case Plan - 'larch ZOU-f <br /> <br />ES.5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.