Laserfiche WebLink
<br />Two Board Flashboard Cap <br />Approx. Construction Time: 4 Hours <br /> <br />Materials for 1000 Linear Feet: <br /> <br />Personnel & Equipment:* <br />Personnel: <br /> <br />168 each 2" x 4" x 5' Posts <br /> <br />1 Foreman (Sector Leader) <br />6 Team Leaders <br />116 Workers <br /> <br />2000 L.F. 1" x 12" Boards <br /> <br />50 Lbs. 20d Common Nails <br />1000 L.F. 2.5 ft., 6 mil Poly <br />400 cu. yds. Clay Earthfill <br /> <br />Tools and Equipment: <br /> <br />4 Axes <br />6 Claw Hammers <br />4 Mauls (Post) <br />110 Shovels <br />100 Wheelbarrows <br />1 Chain saw w/5 gal Fuel, Oil, <br />Spare Chain <br />2 Saws (Crosscut. Hand) <br />1 Plow <br />Lighting Equipment as Needed <br /> <br />"For use where earthmoving <br />equipment cannot be used. <br /> <br /> <br />E-4 <br />