Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />Jf\oWE <br /> <br />Wright Water Engineers. Inc. <br /> <br />DENVER OFFICE <br />2490 West 26th Ave" Suite S5A <br />Denver, Colorado 80211 <br />(303) 480-1700 <br /> <br />TULSA OFFICE <br />707 South Houston, Suite 302 <br />Tulsa, Oklahoma 74127 <br />(918) 584-7136 <br /> <br />GLENWOOD SPRINGS OFFICE <br />818 Colorado Avenue <br />P.O, Box 219 <br />Glenwood Springs, Colorado 81602 <br />(3031945-7755 <br />Denver Direct line: 893-1608 <br /> <br />Mr. N.C. Ioannides, P.E.. Chief <br />Project Planning and Construction Engingeering Section <br />and <br />Mr. David W. Walker, Deputy Director <br />Colorado Water Conservation Board <br />State Services Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br /> <br />/,;'..q.f <br />-B.y <br />coto.:O~ 1..96;'- <br />;s'~~k "4DO <br />'1:;,... ~-1'" <br />vI\! I ~;r <br />~b" <br />....;rD <br /> <br /> <br />March 23. 1987 <br /> <br />Re: Union A venue By-Pass Structure. Revised Plan of Study <br /> <br />Dear Mr. Ioannides and Mr. Walker: <br /> <br />Our Plan of Study, as amended on March 23. 1987, is attached. <br /> <br />The current indemnification clause of the State of Colorado is satisfactory. <br /> <br />The method of payment of 60 percent of the total due upon completion of the <br />work and the final 40 percent due upon acceptance is satisfactory. We will <br />provide monthly statements to you during the course of the work as a record of <br />professional services performed and expenses incurred which will assist in any <br />subsequent audit work performed. <br /> <br />This Plan of Study is carried through Phase I, Project Feasibility, as <br />requested. We understand that if the project proceeds to the design and <br />construction phase that the Wright Water Engineers team contract will be <br />amended to include that work. <br /> <br />Our team of Robert Seams, W. Joseph Shoemaker, Gary Lacy, AI Von Bachmayr, <br />Davis Graham & Stubbs. and Wright Water Engineers is ready to proceed. <br /> <br />Very truly yours, <br />WRIGHT WATER ENGINEERS, INC. <br /> <br />A. <br /> <br />, <br /> <br /> <br />By <br />Kenneth R. <br />Chief Eng <br /> <br />ight, P.E. <br />er <br /> <br />(C87.5,4,3l <br />831-036.080 <br />