Laserfiche WebLink
<br />. <br /> <br />p _ \ ~ M~. <br />~ +0 /aR-. c:UJ ~ <br /> <br />d _ 1.- LA..J~ J. I~ 2) Observation of the flow tests conducted on the <br />~\ \ ~ ~" hydraulic model and consultation on required <br />, JJ.-'\A '\"" -J-Q. ~ ~ modifications as necessitated by those tests. <br /> <br />'^^' t' ~ 12- vJ <br />~0~ <br /> <br />. . <br /> <br />. <br /> <br />-5- <br /> <br /> <br />3) <br /> <br />Observation and acceptance of the test procedures. <br /> <br />4) <br /> <br />Review of the reports and documentation prepared by <br />the USBR. <br /> <br />Estimated cost is $9,000 <br /> <br />2. Resident Engineering /Inspection <br /> <br />~~ck <br />~ ttu- C>>J p; <br />vJJt ~, <br /> <br />a. <br /> <br />Fulltime construction inspection and field engineering <br />to assure the correct placement of materials and <br />adequacy of construction performance. <br />Work items to include: <br /> <br />]) Cg"Qitr'lctiSR staking <br /> <br />2) Inspection of work for quality and adherence to <br />specifications <br /> <br />3) <br />4) <br /> <br />Inspection of material and equipment <br /> <br />Inspection of existing utilities and structures <br /> <br />- <br /> <br />c; <br />~ <br /> <br />5) Daily reports on men, equipment, and work performed <br /> <br />6) Measurement of quantities <br /> <br />7) Project photos and records <br /> <br />8) Insurance of proper rock placement <br /> <br />b. Estimated cost is $28,000 for a 60 working day <br />construction period as indicated on the work schedule.. <br />Costs will be $400/day for additional time required <br />beyond that schedule. <br /> <br />3. Modifications of the Oxford Avenue Boatchutes <br /> <br />a. This phase includes all work necessary for engineered <br />improvements to both upper and lower bqatchutes located <br />near Oxford Avenue for improved boating safety. <br />Specific work items include: <br />