Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />-2- <br /> <br />-- <br /> <br />II. <br /> <br />FINAL DESIGN <br /> <br />A. The final design phase of the project will be undertaken <br />immediately after CWCB notification of approval of the design <br />concepts and will be done concurrently with the hydraulic <br />modeling in the interest of time conservation. The services for <br />this design phase include: <br /> <br />1. Making arrangements for any additional necessary services or <br />field information to be furnished or obtained from others. <br /> <br />2. Preparing final construction drawings and specifications for <br />the project, including directly related landscape in, <br />portage, signage, emergency access, access, and quatics. '7 <br /> <br />~ J}/'i ~ 3. Furnishing the necessary engineering data to apply for <br />~ wJl ~\'\~-~ regulatory permitS car. state dlor <br />. . \ J IlA 0 - ( ~ feder 1 a horities. is distinguished from and does <br />JM ~ ~ ' not include det ed applications and supporting documents <br />for government permits and approval. <br /> <br /> <br />--.-- <br /> <br />4. Preparing and furnishing to the CWCB ten copies of drawings, <br />specifications, and other contract documents, for final <br />review by the CWCB and by approving authorities. <br />--.::> <br />Preparing documents related to construction contracts for <br />review and approval by the CWCB. <br /> <br />Cu \.A hio J- r1N awi-fi <br />~~~ <br />~. p~ O~ evt-. <br /> <br /> <br />6. Preparing detalle<\ flood plaJn mapping for <br />plain modifications~ ~' 'J <br /> <br />GM~ ~ tvv lJ..cL.,. V) , <br /> <br />use in FHAD nooj 'l ~ <br /> <br />Ill. CONSTRUCTION PHASES SERVICES <br /> <br />A. Office Engineering <br /> <br />Services under this phase are undertaken after the advertisement <br />for bids for construction contracts. The basic services in this <br />phase include: D ~ ..€.-t' ~ ? <br /> <br />1. Assis tance to the CWCB in securing bids, tabulation and <br />analysis of bid results, and furnishing recommendations on <br />the award of construction con tracts. <br /> <br />