Laserfiche WebLink
<br />IV-12 <br /> <br />SUB-REACH E: <br /> <br />Item <br /> <br />A. Parks <br />1. Continue Development of <br />the Adams County Regional <br />Park (to be determined <br />by the County) <br /> <br />B. Trails <br />I. Hard Surface Trail <br />Construction <br />2. Soft Surface Trail <br />Construction <br />3. Small Pedestrian Bridge <br /> <br />C. Fishing/Aquatic Life <br />I. Stock Lakes (by others) <br /> <br />O. Wading/Swimming <br />I. Improve the Safety <br />of the Gravel Lakes <br />(by gravel company) <br /> <br />E. Boating <br />I. Boat Landings <br />2. Large Boat Chutes <br /> <br />F. Vtews/Landscaping <br />I. Linear Plantings <br /> <br />G. Wildlife <br />I. Wildlife Plantings <br /> <br />Sub-Reach E: Annual 0 & M Costs <br /> <br />Routine Maintenance <br />l~ Trail Mowing <br />2. Weed Control <br />3. Oebris & Trash Removal <br />4. Trail Sweepi ng <br /> <br />COST ESTIMATE <br /> <br />Quantity <br /> <br />Unit <br />Cost <br /> <br />COST ESTIMATE <br /> <br />SUB-REACH F: <br /> <br />136TH Avenue to Baseline Road <br /> <br />Total <br /> <br />Item Quantity <br /> <br />A. Parks <br />I. 160th Ave. Pocket Park 1.0 AC <br />2. Brighton Wildlife Preserve <br />3. Smith Natural Area <br />4. Land Acquisition 1.0 AC <br /> <br />n/a <br /> <br />2.3 MI 200,000 460,000.00 <br />2.3 MI 50,000 115,000.00 <br />LS 50,000 50,000.00 <br /> Subtotal: $625,000.00 <br /> n/a <br /> n/a <br /> <br />5 <br />3 <br /> <br />6,000 <br />250,000 <br /> <br />Subtotal: <br /> <br />2.3 MI <br /> <br />21,000 <br /> <br />Subtotal: <br /> <br />2.3 MI <br /> <br />13,000 <br /> <br />Subtotal: <br /> <br />Total: <br />30% Contingency: <br /> <br />TOTAL SUB-REACH E: <br /> <br />12,144 LF .36 <br />12,144 LF .09 <br />12,144 LF .50 <br />12,144 LF .58 <br /> <br />Unit <br />Cost <br /> <br />$40,000 <br /> <br />35,000 <br /> <br />Subtota I : <br /> <br />B. Trails <br /> 1. Hard Surface Trail 4.3 MI 200,000 <br /> Construction <br /> 2. Pedestrian Bridge - LS 250,000 <br /> unchannelized <br /> 3. Soft Surface Trail 4.2 MI 50,000 <br /> Construction <br /> 4. Pedestrian Bridge - LS 50,000 <br /> drainage crossing <br /> <br />C. Boating <br />I. Large Boat Chute <br />2. Portages <br /> <br />2 <br />4 <br /> <br />30,000.00 <br />750,000.00 <br /> <br />O. Fishing/Acquatic Life <br />1. Stock Lakes <br /> <br />$780,000.00 <br /> <br />E. Wading/Swimming <br />I. Improve Safety of <br />Gravel Lakes <br /> <br />48,300.00 <br /> <br />F. Access Points <br />1. Park i ng Lot <br /> <br />$48,300.00 <br /> <br />29,900.00 <br /> <br />$29,900.00 <br /> <br />Subtotal: <br /> <br />250,000 <br />6,000 <br /> <br />Subtota I : <br /> <br />40,000 <br /> <br />Subtota I : <br /> <br />Total: <br />30% Contingency: <br /> <br />$1 ,483,200.00 <br />444,960.00 <br /> <br />Sub-Reach F: Annual 0 & M Cost <br /> <br />TOTAL SUB-REACH F: <br /> <br />$1,928,160.00 <br /> <br />4,372.00 <br />1,093.00 <br />6,072.00 <br />7,044.00 <br /> <br />Routine Maintenance <br />1. Trail Mowing <br />2. Weed Cont ro 1 <br />3. Oebris & Trash Removal <br />4. Trail Sweeping <br />5. Park Mowing <br /> <br />22,704 LF <br />22,704 LF <br />22,704 LF <br />22,704 LF <br />14.0 AC <br /> <br />$18,581.00 <br /> <br />.36 <br />.09 <br />.50 <br />.58 <br />480.00 <br /> <br />Total <br /> <br />$ 40,000.00 <br />n/a <br />n/a <br />35,000.00 <br /> <br />$75,000.00 <br /> <br />860,000.00 <br />250,000.00 <br />210,000.00 <br />50,000.00 <br /> <br />$1,370,000.00 <br /> <br />500,000.00 <br />24,000.00 <br /> <br />$524,000.00 <br /> <br />n/a <br /> <br />n/a <br /> <br />40,000.00 <br /> <br />$40,000.00 <br /> <br />$2,009,000.00 <br />602,700.00 <br /> <br />$2,611,700.00 <br /> <br />8,173.00 <br />2,043.00 <br />11,352.00 <br />13,168.00 <br />6,720.00 <br /> <br />$41,456,00 <br />