|
<br />IV-12
<br />
<br />SUB-REACH E:
<br />
<br />Item
<br />
<br />A. Parks
<br />1. Continue Development of
<br />the Adams County Regional
<br />Park (to be determined
<br />by the County)
<br />
<br />B. Trails
<br />I. Hard Surface Trail
<br />Construction
<br />2. Soft Surface Trail
<br />Construction
<br />3. Small Pedestrian Bridge
<br />
<br />C. Fishing/Aquatic Life
<br />I. Stock Lakes (by others)
<br />
<br />O. Wading/Swimming
<br />I. Improve the Safety
<br />of the Gravel Lakes
<br />(by gravel company)
<br />
<br />E. Boating
<br />I. Boat Landings
<br />2. Large Boat Chutes
<br />
<br />F. Vtews/Landscaping
<br />I. Linear Plantings
<br />
<br />G. Wildlife
<br />I. Wildlife Plantings
<br />
<br />Sub-Reach E: Annual 0 & M Costs
<br />
<br />Routine Maintenance
<br />l~ Trail Mowing
<br />2. Weed Control
<br />3. Oebris & Trash Removal
<br />4. Trail Sweepi ng
<br />
<br />COST ESTIMATE
<br />
<br />Quantity
<br />
<br />Unit
<br />Cost
<br />
<br />COST ESTIMATE
<br />
<br />SUB-REACH F:
<br />
<br />136TH Avenue to Baseline Road
<br />
<br />Total
<br />
<br />Item Quantity
<br />
<br />A. Parks
<br />I. 160th Ave. Pocket Park 1.0 AC
<br />2. Brighton Wildlife Preserve
<br />3. Smith Natural Area
<br />4. Land Acquisition 1.0 AC
<br />
<br />n/a
<br />
<br />2.3 MI 200,000 460,000.00
<br />2.3 MI 50,000 115,000.00
<br />LS 50,000 50,000.00
<br /> Subtotal: $625,000.00
<br /> n/a
<br /> n/a
<br />
<br />5
<br />3
<br />
<br />6,000
<br />250,000
<br />
<br />Subtotal:
<br />
<br />2.3 MI
<br />
<br />21,000
<br />
<br />Subtotal:
<br />
<br />2.3 MI
<br />
<br />13,000
<br />
<br />Subtotal:
<br />
<br />Total:
<br />30% Contingency:
<br />
<br />TOTAL SUB-REACH E:
<br />
<br />12,144 LF .36
<br />12,144 LF .09
<br />12,144 LF .50
<br />12,144 LF .58
<br />
<br />Unit
<br />Cost
<br />
<br />$40,000
<br />
<br />35,000
<br />
<br />Subtota I :
<br />
<br />B. Trails
<br /> 1. Hard Surface Trail 4.3 MI 200,000
<br /> Construction
<br /> 2. Pedestrian Bridge - LS 250,000
<br /> unchannelized
<br /> 3. Soft Surface Trail 4.2 MI 50,000
<br /> Construction
<br /> 4. Pedestrian Bridge - LS 50,000
<br /> drainage crossing
<br />
<br />C. Boating
<br />I. Large Boat Chute
<br />2. Portages
<br />
<br />2
<br />4
<br />
<br />30,000.00
<br />750,000.00
<br />
<br />O. Fishing/Acquatic Life
<br />1. Stock Lakes
<br />
<br />$780,000.00
<br />
<br />E. Wading/Swimming
<br />I. Improve Safety of
<br />Gravel Lakes
<br />
<br />48,300.00
<br />
<br />F. Access Points
<br />1. Park i ng Lot
<br />
<br />$48,300.00
<br />
<br />29,900.00
<br />
<br />$29,900.00
<br />
<br />Subtotal:
<br />
<br />250,000
<br />6,000
<br />
<br />Subtota I :
<br />
<br />40,000
<br />
<br />Subtota I :
<br />
<br />Total:
<br />30% Contingency:
<br />
<br />$1 ,483,200.00
<br />444,960.00
<br />
<br />Sub-Reach F: Annual 0 & M Cost
<br />
<br />TOTAL SUB-REACH F:
<br />
<br />$1,928,160.00
<br />
<br />4,372.00
<br />1,093.00
<br />6,072.00
<br />7,044.00
<br />
<br />Routine Maintenance
<br />1. Trail Mowing
<br />2. Weed Cont ro 1
<br />3. Oebris & Trash Removal
<br />4. Trail Sweeping
<br />5. Park Mowing
<br />
<br />22,704 LF
<br />22,704 LF
<br />22,704 LF
<br />22,704 LF
<br />14.0 AC
<br />
<br />$18,581.00
<br />
<br />.36
<br />.09
<br />.50
<br />.58
<br />480.00
<br />
<br />Total
<br />
<br />$ 40,000.00
<br />n/a
<br />n/a
<br />35,000.00
<br />
<br />$75,000.00
<br />
<br />860,000.00
<br />250,000.00
<br />210,000.00
<br />50,000.00
<br />
<br />$1,370,000.00
<br />
<br />500,000.00
<br />24,000.00
<br />
<br />$524,000.00
<br />
<br />n/a
<br />
<br />n/a
<br />
<br />40,000.00
<br />
<br />$40,000.00
<br />
<br />$2,009,000.00
<br />602,700.00
<br />
<br />$2,611,700.00
<br />
<br />8,173.00
<br />2,043.00
<br />11,352.00
<br />13,168.00
<br />6,720.00
<br />
<br />$41,456,00
<br />
|