Laserfiche WebLink
<br />IV-8 <br /> <br />Reach Seven -- Franklin to <br />Flood Control Alternative: <br /> <br />Sand Creek <br />limited Structural <br />Management <br />linear Park <br /> <br />Improvements and Floodplain <br /> <br /> COST ESTIMATE <br />REACH 7: Frankl;n to Sand Creek <br /> Unit <br /> Item Quantity Cost Total <br />A. Parks <br /> !. 64th Ave. Pocket Park 1 AC $40,000 $ 40,000.00 <br /> 2. York Street Pocket Park 1 AC 40,000 40,000.00 <br /> 3. Franklin St. Pocket Park 1 AC 40,000 40,000.00 <br /> 4. land Acquisition 3 AC 35,000 105,000.00 <br /> Subtotal: $225,000.00 <br />8. Trails <br /> !. Hard Surface Trail 2.3 MI 200,000 460,000.00 <br /> Construction <br /> 2. Burlington Canal LS 50,000 50,000.00 <br /> Pedestrian Bridge - <br /> creek type <br /> 3. Hard Surface Trail .9 MI 200,000 180,000.00 <br /> Construction from Sank Creek <br /> Confluence to Brighton Blvd. <br /> 4. Underpass Construction 2 60,000 120,000.00 <br /> 5. Pedestrian Bridge 2 250,000 500,000.00 <br /> Subtotal: $1,310,000.00 <br />C. Boating <br /> !. Large Boat Chutes 2 250,000 500,000.00 <br /> 2. Medium Boat Chutes 2 60,000 120,000.00 <br /> 3. Small Boat Chutes 2 30,000 60,000.00 <br /> 4, Boat Landjngs ]] 6,000 48,000,00 <br /> Subtotal: $728,000.00 <br />O. Views/Landscaping <br /> !. Soil Cover for unsightly 6 AC 3,000 18,000.00 <br /> riprap. seeding & mulChing <br /> Subtotal: 18,000.00 <br />E. Wildlife <br /> !. Wildlife Plantings (also 2.1 MI 21,000 44,100,00 <br /> serves a visual landscape <br /> purpose) <br /> <br />REACH COMMENTARY <br /> <br />.... . _ 1..... 1" __-I 1 C .... ':l'") <br />.:>nee~s l'}, 1'+, allu J.;; UI L..) <br /> <br />Station 1068+00 to 960+00 <br /> <br />Recreation Alternative: <br /> <br />Several pocket parks are proposed in this section, including those at <br />Franklin street, York Street, 64th Avenue and Highway 270 frontage road. <br />The trail runs on the east bank to a point just south of the Metro Sewer <br />Plant where it crosses on a new pedestrian bridge and continues on the west <br />bank to Sand Creek. The roads and open area of the Riverside Cemetary <br />could be incorporated into the trail corridor in this reach. <br /> <br />Seven river obstructions need to be improved with boat chutes and landings <br />for continuous passage and improved safety. An opportunity exists for a <br />Reserve Park for wildlife and passive recreation at the confluence with <br />Sand Creek where additional wetlands might also be created. Native <br />plantings of cottonwood, willow and dense ground cover should be <br />accomplished to enhance the wildlife habitat, together with selective rock <br />placement in the channel for improvement of the acquatic environment. The <br />tributary connection along Sand Creek to the Highline Canal, which serves <br />Aurora and other east-side metropolitan areas, should also be developed <br />before the opportunity is lost. A new pedestrian bridge will be required <br />to connect the Sand Creek trail to the Greenway trail. <br /> <br />Subtotal: <br /> <br />$44,100.00 <br /> <br />Total: <br />30% Cont i ngency: <br /> <br />$2,325,100.00 <br />697,530.00 <br /> <br />TOTAL REACH 7: <br /> <br />$3,022,630.00 <br /> <br />Reach 7: Annual 0 & M Costs <br /> <br />Routine Maintenance <br />1. Trail Mowing <br />2, Weed Cont ro 1 <br />3. Debris & Trash Removal <br />4. Trail Sweeping <br />5. Park Mowing <br /> <br />12,144 LF <br />12,144 LF <br />12,144 LF <br />12,144 LF <br />17 AC <br /> <br />.36 <br />.09 <br />.50 <br />.58 <br />480,00 <br /> <br />4,372.00 <br />1,093.00 <br />6,072,00 <br />7,044.00 <br />6,720.00 <br /> <br />$25,301.00 <br />