<br /> COST ESTIMATE
<br />REACH 7: Frankl;n to Sand Creek
<br /> Unit
<br /> Item Quantity Cost Total
<br />A. Parks
<br /> !. 64th Ave. Pocket Park 1 AC $40,000 $ 40,000.00
<br /> 2. York Street Pocket Park 1 AC 40,000 40,000.00
<br /> 3. Franklin St. Pocket Park 1 AC 40,000 40,000.00
<br /> 4. land Acquisition 3 AC 35,000 105,000.00
<br /> Subtotal: $225,000.00
<br />8. Trails
<br /> !. Hard Surface Trail 2.3 MI 200,000 460,000.00
<br /> Construction
<br /> 2. Burlington Canal LS 50,000 50,000.00
<br /> Pedestrian Bridge -
<br /> creek type
<br /> 3. Hard Surface Trail .9 MI 200,000 180,000.00
<br /> Construction from Sank Creek
<br /> Confluence to Brighton Blvd.
<br /> 4. Underpass Construction 2 60,000 120,000.00
<br /> 5. Pedestrian Bridge 2 250,000 500,000.00
<br /> Subtotal: $1,310,000.00
<br />C. Boating
<br /> !. Large Boat Chutes 2 250,000 500,000.00
<br /> 2. Medium Boat Chutes 2 60,000 120,000.00
<br /> 3. Small Boat Chutes 2 30,000 60,000.00
<br /> 4, Boat Landjngs ]] 6,000 48,000,00
<br /> Subtotal: $728,000.00
<br />O. Views/Landscaping
<br /> !. Soil Cover for unsightly 6 AC 3,000 18,000.00
<br /> riprap. seeding & mulChing
<br /> Subtotal: 18,000.00
<br />E. Wildlife
<br /> !. Wildlife Plantings (also 2.1 MI 21,000 44,100,00
<br /> serves a visual landscape
<br /> purpose)
<br />
<br />REACH COMMENTARY
<br />
<br />.... . _ 1..... 1" __-I 1 C .... ':l'")
<br />.:>nee~s l'}, 1'+, allu J.;; UI L..)
<br />
<br />Station 1068+00 to 960+00
<br />
<br />Recreation Alternative:
<br />
<br />Several pocket parks are proposed in this section, including those at
<br />Franklin street, York Street, 64th Avenue and Highway 270 frontage road.
<br />The trail runs on the east bank to a point just south of the Metro Sewer
<br />Plant where it crosses on a new pedestrian bridge and continues on the west
<br />bank to Sand Creek. The roads and open area of the Riverside Cemetary
<br />could be incorporated into the trail corridor in this reach.
<br />
<br />Seven river obstructions need to be improved with boat chutes and landings
<br />for continuous passage and improved safety. An opportunity exists for a
<br />Reserve Park for wildlife and passive recreation at the confluence with
<br />Sand Creek where additional wetlands might also be created. Native
<br />plantings of cottonwood, willow and dense ground cover should be
<br />accomplished to enhance the wildlife habitat, together with selective rock
<br />placement in the channel for improvement of the acquatic environment. The
<br />tributary connection along Sand Creek to the Highline Canal, which serves
<br />Aurora and other east-side metropolitan areas, should also be developed
<br />before the opportunity is lost. A new pedestrian bridge will be required
<br />to connect the Sand Creek trail to the Greenway trail.
<br />
<br />Subtotal:
<br />
<br />$44,100.00
<br />
<br />Total:
<br />30% Cont i ngency:
<br />
<br />$2,325,100.00
<br />697,530.00
<br />
<br />TOTAL REACH 7:
<br />
<br />$3,022,630.00
<br />
<br />Reach 7: Annual 0 & M Costs
<br />
<br />Routine Maintenance
<br />1. Trail Mowing
<br />2, Weed Cont ro 1
<br />3. Debris & Trash Removal
<br />4. Trail Sweeping
<br />5. Park Mowing
<br />
<br />12,144 LF
<br />12,144 LF
<br />12,144 LF
<br />12,144 LF
<br />17 AC
<br />
<br />.36
<br />.09
<br />.50
<br />.58
<br />480,00
<br />
<br />4,372.00
<br />1,093.00
<br />6,072,00
<br />7,044.00
<br />6,720.00
<br />
<br />$25,301.00