My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD04373
CWCB
>
Floodplain Documents
>
Backfile
>
4001-5000
>
FLOOD04373
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:46:03 PM
Creation date
10/5/2006 12:34:35 AM
Metadata
Fields
Template:
Floodplain Documents
Designation Number
230
County
Boulder
Community
Longmont
Stream Name
St. Vrain Creek
Basin
South Platte
Title
Flood Control and Floodplain Management Plan for St. Vrain Creek at Longmont, Colorado
Date
4/1/1981
Designation Date
3/1/1984
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Wt!1,r !hsourcet; Consultants <br /> <br />FIGURE - I <br /> <br /> <br />- <br /> <br />-1 <br /> <br />! <br /> <br />, <br /> <br />.1 <br /> <br />- <br /> <br />,- <br /> <br />~, <br /> <br />.. <br /> <br />. <br /> <br />, <br /> <br />'- <br />:-~-~_.. <br />'. "." <br />'.._.....~,.,.; <br />. .-;'}',~ <br /> <br />- <br /> <br />... <br /> <br />.. <br />" <br /> <br />UPSTf?EAM STUDY <br />LIMIT <br /> <br />.. <br /> <br />.' <br /> <br />. <br />, <br />, <br />, <br /> <br />5T. VRAIN CREEK <br /> <br />--. <br /> <br />.. <br /> <br />'~ <br /> <br />''''''''''~''..- <br /> <br />--C;,y'. <br /> <br />_. <br /> <br />DOWNSTREAM <br />STUDY LIMIT <br />.r <br /> <br />-, <br /> <br />.. <br /> <br />.~ <br /> <br />^. <br />'- <br /> <br />, <br /> <br />'- <br /> <br />-1 <br />J <br /> <br />./ <br /> <br />" <br />..~. <br />~a"d L <br /> <br />.. <br /> <br />11. <br /> <br />1 <br />1 <br />, <br /> <br />M"." <br /> <br />- <br /> <br />^"\y' <br /> <br />~' <br /> <br />,/" <br /> <br />.. <br /> <br />,r' <br /> <br />_.. .. <br /> <br />.. <br /> <br />n, <br /> <br />""_':O>""~ <br /> <br />~""" '1<1 <br /> <br />.. <br /> <br />_ STUDY REACH.sr VRAIN CREEK <br /> <br />13, <br /> <br />.. <br />, <br />, <br />. <br />l""""""'" <br />", <br />. <br />, <br /> <br />SCALE: ('= 6600' <br /> <br />" <br />.. <br />, <br />.. <br /> <br />V!CIN/Tr <br />M'P <br /> <br />", <br /> <br />~ <br /> <br />15, <br /> <br />.. <br /> <br />of 10"0 <br /> <br />.- <br /> <br />.-- <br /> <br />STUOY AREA LOCATION <br /> <br />-J- -4- <br /> <br />F~/NUOry, /98/ <br /> <br />4. Review the existing hydrology prepared hy the U.S. Army Corps of <br />Engirreers and make recommendations to the lechr.ical Commlttee <br />regarding the peak flo~s for the various ff~qu~ncies. Also, pro- <br />vide input to the Technical Committee regarding tho year 2000 <br />hydrology to h. dev~loped by the Corps. <br /> <br />5. Condu~t hydrauli~ analysis aimed at analyzing hydrauli~ st,u~tures On <br />St. Vrain Creek and to compute water surfa~e profiles tor the 5-, 10-, <br />50-, 100-, &nd 500.year frequency storms for both ~he existing and <br />future (year 2000) basin development ~onditions. <br /> <br />6, <br /> <br />D~linea[e the lOO-year flooded area" and present the floodway limits <br />on ad~inistrative ~p.. <br /> <br />7. Prepare a drainage plan for the Boulder County Fairgrounds. <br /> <br />8. Id~ntify existin8, potential future flooding ptoblems, snd other ptObtern5 <br />within the study tea~h. <br /> <br />9. Asaess the existing and potential flood damage. <br /> <br />10, <br /> <br />Evaluate altetnative feasibl~ plans for flood ptotection and draina~e <br />improv~m~nt" and ~re~~nt the sa~e to the Tech~ical Co~ittcc for the <br />selection of th~ tinal alternatives. <br /> <br />Ptepate conceptual plan., dc~igns, and project costs fot the <br />altetnstives and ~ke specific recommendations to the Technical <br />Committee regatding the posltive and negative aspects of each pL." <br />and the impact of each plan On the lOO-year floodplain. <br /> <br />Ptepate a cost/benefit cowpa.ison fot the selected plan fot i~ple~enta- <br />ticn after finalizing the proposed plan of imptovements. <br /> <br />Prepare and submit a draft of the final report for review and approval. <br /> <br />Ptepare the final r~pon and the ,w~eS$ary technical addendUl1l(.). <br /> <br />Ptesent the final teport. <br />
The URL can be used to link to this page
Your browser does not support the video tag.