Laserfiche WebLink
<br /> <br />COST <br />Clas. <br /> <br />02 <br /> <br />09 <br /> <br />" <br /> <br />Levees' <br />Levees: <br />Embankment (placing only) <br />ExcevlltIOll(dl"lllndltcll) <br />ElCCeVlltion (bor-I"ow) <br />Clelll"lng <br />Inspectiontrencll <br />Flexible steel jetties <br />Gl"evel sUl"foelng <br />Contingencies <br /> <br />Subtotal, Levees - <br /> <br />Ol"elllllge st1"UCtU1"9S: <br />Concl"ete (levee eulvel"ts) <br />ReinfOr"cingsteel (Ieveeculvel"ts) <br />60" CW' in place (leveo culvel"ts) <br />36" CMP in place <br />60" Ilutometic gote <br />36"eutOfllllticgote <br />60" gote with lift <br />36" gets with. lift <br />Contingencies <br /> <br />Subtotlll,Ol"llin.!lgeSt-ructures- <br /> <br />Totolll, Levees - <br /> <br />" <br /> <br />SewllCle PumoinQ Plant: <br />Pumps, (cllp6l;ity, 210 g.p.m. each) <br />Contingencies <br /> <br />Total, SewolIge PumpingPllInt- <br /> <br />30 <br /> <br />Enoi neerlM al'ld Des lon- - ~ - - - <br /> <br />31 Suoorvlsion llod Administrlltion- - <br /> <br />TOTAL FEOERAL F IRST COST~ - <br /> <br />NON-FEDERAL FIRST COST <br /> <br />LandsllndOollmlloes: <br />Lllnds: <br />Fee, irrigllted (levees) <br />Fee,grllzing (levees) <br />Borrow ellsemant, gl"olIzing (levees) <br />Flowllgeeesemant,grollzing (pondingllrell) <br />Severence <br />Contingencies <br /> <br />Subtotolll, Lllnds~ <br /> <br />Acquisition: <br />Costs <br />Conti 'Igenc les <br /> <br />Subtotlll,AcquisitionCosts- <br /> <br />Tote I , Ulnds Ilnd DelMges- <br /> <br />",""'1'<' <br /> <br />TABLE 2, - EstlmllTed First Cost end Annuel Cherges - Les AninlllS Local Protection Project (Jenuery 1963 Price Levels) <br /> <br /> 891,400 <br /> 3,400.00 0,800 <br /> , 300 <br /> 8,100 <br /> -!- 159,2oo <br /> + '08 300 <br /> l 1,541,000 <br /> I <br />" 275.00 23,650 <br />40 25.00 , ,000 <br />55 25.00 1,375 <br />80 25.00 2,000 <br /> 10,000 <br /> 6375 <br /> 44,400 <br /> 7,500 <br /> J.......!.QQ <br /> 6,000 <br /> 53,000 <br /> <br />C.Y. <br />C.Y. <br />C.Y. <br />Am <br />C.Y. <br />E~" <br />C.Y. <br /> <br />=.000 <br />"'.000 <br />966.400 <br />30 <br />55,000 <br />'.200 <br />10,440 <br /> <br />0.14 <br />0.35 <br />0.30 <br />200.00 <br />0.50 <br />50.00 <br />4.00 <br /> <br />45.00 <br />O.lg <br />32.00 <br />15.00 <br />730.00 <br />2BO . 00 <br />1,800.00 <br />550.00 <br /> <br />Otlscriptlon <br /> <br />Unit Quentlty Unit COST " " ., <br />Job loS. $2,000 <br />Job loS. 5,800 <br />Job loS. 57,200 <br />C.Y. " 50.00 4.900 <br />Lbs. 9,800 O.lg 1,862 <br />E~" 3 800.00 2.400 <br />E~" 2 1,500.00 3.000 <br /> 31 338 <br /> $106.500 <br /> 13,500 <br /> - -- - -- 9 000 <br /> - -- ---- -- 184,000 <br /> - -- - ---- - $1.125,000 <br /> <br />NON-FEOERAl.FIRST COST (Cont'd) <br /> <br />Relocations: <br />utiliTies <br />County road <br />Reilroadrelse <br />IrrigeTlon STructures: <br />Concrote <br />RelntOl"cingsteel <br />48" x 72" gates <br />60" x 60" gllTes <br />Contingencies <br /> <br />Total, RIllocetlons - <br /> <br />Enaineerlno and Oeslon--- <br /> <br />_ L _ _ _ <br /> <br /> DescripTion Unit QuantiTy Unit COST ,,' <br /> toel ot., <br /> FEOE~l.FIF!ST COST <br />ReI<X:ll'tions: <br />Roed ramps Each $725.00 $3,625 <br />ReilrOllO bridg" altaration Job LS. 302,000 <br />Contingoncles ~ <br />Total, RelOColltlons -- - ----- --- - - - I $367,000 <br />~: <br />Cllollnnel cleollrlng Acre 29 200 ,00 , 5,800 <br />Contingencies -- , I,ZOO <br />Total, Cllllnnels- - - -- - -- -- - -- - - -- ',000 <br /> <br />C.Y. <br />Lbs. <br />L_F. <br />L.F. <br />E~" <br />Eech <br />E~" <br />E~" <br /> <br />252 <br />25,200 <br />1<< <br />" <br />6 <br />, <br />6 <br />, <br /> <br />129,060 <br />31,500 <br />289,920 <br />6.000 <br />27,500 <br />160,000 <br />4!,800 <br />137 600 <br /> <br />Suoervlsion and Administration- <br /> <br />EolIch <br /> <br />Acre <br />Acre <br />Acre <br />Acre <br /> <br />TOTAL NON-fEOERAL FIRST COST~ <br />TOTAL FIRST COST - - - - -- <br /> <br />INVFSTloENT AN) AtflLlA1 Cl-lAR'iES <br /> <br />823,400 <br /> <br />Federolll Investnlllnt:* <br />Fedel"olIl firsteost <br />Intere5t during construction (less tha~ 2 yl"s.) <br /> <br />, 1,541,000 <br /> <br />11,340 <br />4,768 <br />23.806 <br />1,020 <br />4.380 <br />280 <br />10,800 <br />550 <br />" "" <br />68,000 <br /> <br />Tote I F"deral Investment - - - - - - - - - - - - - - - - - - - - - - - - <br /> <br /> 1,541,000 <br />184,000 <br /> 164000 <br /> i,725,000 <br />%,230 <br />2 54Q <br /> 48,770 <br />5,520 <br />300 <br />4410 <br /> 10 230 <br /> $59,000 <br /> <br />Non-Fedel"al Investmant: <br />Non-federolll first cost <br />Interest during construction (less Tlla, 2 yrs.) <br />TotlllNon-Federallnvestmant <br /> <br />TOTAL INVESTlEN1- - - <br /> <br />Federlll AnnUolll Cherees: <br />InTerest on investfOOnt (3f) <br />Amortlzetion of invesTmanT (100 yrs. 83f) <br /> <br />Total Feder1l1 Annual Chllrges - <br /> <br />--:- <br /> <br />Non-Federal AnnUllIChllrces: <br />'nterest on investmant @3f <br />Atnortizetion of invostmant [100 yrs. @3f) <br />Operetloll, (Illlintenen<:o, olInd replacement: <br />Floodcontp-ol facilities <br /> <br />TOTal Non-Federel AnnUolll Cherges <br /> <br />TOTAL ANNUAL CHAR;ES- - - - - <br /> <br />Cost of Borrow from Flshinc Leke Site <br />i'l Fl<cess of leest costlv AlterneTive: <br />Excevolltlon from wet <br />OVerhollul <br />ConTingencies <br />Engine<ilri'lg and design <br />Supervision and odministretion <br /> <br />3.000 <br />20.000 <br />4,600 <br />3,400 <br />2000 <br /> <br />Total - - - - - - - - - - - - - - - - - - - - - - - - - ~ - ~ - - - - - - - <br /> <br />:n,ooo <br /> <br />* Ooes not Include pre1luthorizetion STudy cost of $54,000. <br /> <br />RI/'lB/64 <br /> <br />A-IO <br /> <br />