My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD04325
CWCB
>
Floodplain Documents
>
Backfile
>
4001-5000
>
FLOOD04325
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:45:55 PM
Creation date
10/5/2006 12:33:04 AM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
State of Colorado
Basin
Statewide
Title
Rules and Regulations for Dam Safety and Dam Construction
Date
9/30/1988
Prepared For
State of Colorado
Prepared By
State of Colorado DNR
Floodplain - Doc Type
Educational/Technical/Reference Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />... <br /> <br />5.A.(6)(d) For Class III da.s. other than minor ones. the <br />report shall include the field salls classification. geotechnical <br />logs. standard penetration tests and the require..nts of Rule <br />5.A.(6)(c) Sections (1). (2) and (6). The foundation exploration <br />shall include drilling to. and penetration of the bedrock. or 1.5 <br />till8s the height of the dam. whichever 15 less. <br /> <br />5.A.(6)(d)1 Minor. Class III and all Class IV da.s shall <br />include field soils classifications as a minimum. <br /> <br />5.A.(6)(e) For all dams, except minor Class III and all Class <br />IV. with a spillway located on an earth foundation. the report shall <br />Include the following: . <br /> <br />I. Soil classification; <br /> <br />2. Soil profile logs along .the channel extending at least <br />five feet below ,the bottom of the spillway; <br /> <br />3. Density or bearing capacity of foundation; and <br /> <br />4. Gradation of soils. <br /> <br />5.A.(6)(f) For all dams. except minor Class III and all Class <br />IV. with spillways located on a rock foundation. the report shall <br />include a geologic description of the rock. Including q,ddlng and <br />jointing and demonstrate that the site is adequate to accommodate the <br />proposed spillway. <br /> <br />5.A.(6)(g) The following criteria shall be required. as a <br />minimum in the geotechnical design: <br /> <br />1. The loading conditions shall not exceed the allowable <br />stress of the foundation and appurtenant structures; . <br /> <br />2. Seepage through the embankment, abutments. and the <br />foundation shall be controlled to prevent Internal erosion and <br />external sloughing: <br /> <br />3. The embankment shall be protected against external <br /> <br />erosion; <br /> <br />4. The crest width shall be equal to the vertical height <br />plus freeboard in feet divided by 5 plus 10 feet. However. the <br />maximum crest width required shall be 25 feet: <br /> <br />- 20 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.