My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD04325
CWCB
>
Floodplain Documents
>
Backfile
>
4001-5000
>
FLOOD04325
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:45:55 PM
Creation date
10/5/2006 12:33:04 AM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
State of Colorado
Basin
Statewide
Title
Rules and Regulations for Dam Safety and Dam Construction
Date
9/30/1988
Prepared For
State of Colorado
Prepared By
State of Colorado DNR
Floodplain - Doc Type
Educational/Technical/Reference Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />day of <br /> <br />19___ <br /> <br />Approved on the <br /> <br />State Engineer <br />~: <br />Deputy <br /> <br />S.A.(3)(b) The specifications shall be indexed. <br /> <br />. <br /> <br />S.A.(3)(c) Final specifications shall be bound and submitted on <br />a good grade of white 8 1/2- by II-inch paper. <br /> <br />S.A.(3)(d) The general conditions shall include statements that <br />the plans and specifications cannot be significantly changed without <br />the prior written approval of the State Engineer in accordance with <br />Rule 9.A.(8). <br /> <br />S.A.(3)(e) The general conditions shall include the provision <br />that construction shall not be considered complete until the state <br />engineer has accepted the construction in writing. <br /> <br />S.A.(3)(f) The specifications shall provide that the owner's <br />engineer will monitor the quality of construction as specified in Rule <br />9. <br /> <br />S.A.(3)(g) The specifications shall include as a minimum, but <br />are not limited to. the following: <br /> <br />I. The quality of materials used in construction; <br /> <br />2. The acceptable quality of workmanship; <br /> <br />3. . The reference to applicable standards, if any; <br /> <br />4. The required tests and estimated frequency of testing; and, <br /> <br />5. The action to be taken if unsatisfactory materials or <br />workmanship are discovered in the construction. <br /> <br />S.A.(4) A classification report which complies with these rules, <br />and sets forth the classification of the proposed dam, or for the <br />proposed enlargement of an existing dam_ A report is not required for <br />dams which are declared as Class I; however, a dam failure inundation <br />map will be required for the Emergency Preparedness Plan pursuant to <br />Rule 16.A.(3). The report shall include sufficient calculations or <br />data to establish the reasonableness of the predicted dam failure <br />flood which may include several failure rates and sizes of breach, and <br />an assessment of the Impact of a dam failure upon the downstream <br />floodplain. The report shall classify the dam in accordance with Rule <br />4.A.(S). <br /> <br />- 12 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.