Laserfiche WebLink
<br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />- 40 - <br /> <br />Step 12 - Compute the Costs of the Various Flood Control <br /> <br />Alternatives <br /> <br />Costs considered in this step should include at least all <br /> <br />of those listed in Step 5. Prepare a table that reflects end- <br /> <br />of-the-year costs over the project life. Such a table might <br /> <br />resemble Table 8 which follows. The period of loan repayment <br /> <br />does not have to correspond to the project life if debt <br /> <br />financing is to be utilized. <br /> <br />~ Leonard Rice Consulting Water Engineers, Inc. <br />