Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />- 37 - <br /> <br />Step 11 - Compute the Benefits for Each Flood Control Alternative <br /> <br />The reduction in the annual flood damage potential is the <br /> <br />"benefit" realized if the flood control improvement was con- <br /> <br />structed. The average annual benefit is illustrated graphically <br /> <br />in Figure 3 which compares the damage probability curves of the <br /> <br />future situation with the curve for the first alternative. <br /> <br />Quantify the other tangible benefits identified in Step 6 and <br /> <br />tabulate as in Table 7. <br /> <br />~ Leonard Rice Consulting Water Englreers.lnc. <br />