My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD04322
CWCB
>
Floodplain Documents
>
Backfile
>
4001-5000
>
FLOOD04322
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:45:55 PM
Creation date
10/5/2006 12:32:38 AM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
State of Colorado
Stream Name
All
Basin
Statewide
Title
Benefit-Cost Analysis for Urban Drainage Planning
Date
3/1/1974
Prepared For
UDFCD
Prepared By
CSU
Floodplain - Doc Type
Educational/Technical/Reference Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />- 9 - <br /> <br />Example Benefit-Cost Analysis <br /> <br />To illustrate the benefit-cost analysis methodology, a <br /> <br />step-by-step description of an actual project is presented. <br /> <br />The example is based upon the Little Dry Creek project located <br /> <br />in Douglas and Arapahoe Counties, Colorado, undertaken for the <br /> <br />Urban Drainage and Flood Control District by the firm of McCall- <br /> <br />Ellingson & Morrill Inc., consulting engineers, as assisted by <br /> <br />the firm of Lyon, Collins & Co., Inc., local governmental con- <br /> <br />sultants. This basin was chosen as a case study because of <br /> <br />the varied conditions encountered and the detail of the analysis <br /> <br />conducted. To broaden the scope of the example, certain ele- <br /> <br />ments and conditions not found in the Little Dry Creek basin <br /> <br />have been included. It must be emphasized that each project <br /> <br />will present a unique situation in terms of flood hydrology, <br /> <br />development characteristics, alternative solutions and other <br /> <br />features, therefore the step-by-step description must be con- <br /> <br />sidered as a guide to performing benefit-cost analysis and not <br /> <br />as a rigid formula. As in other portions of the urban drainage <br /> <br />master planning process, a significant degree of engineering <br /> <br />judgement is required to achieve an acceptable and realistic <br /> <br />solution. <br /> <br />Step 1 - Examine Area and Classify by Land Use <br /> <br />The following types of land use are typical: <br /> <br />~ Leonard Rice Consulting Water Engineers, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.