My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD04311
CWCB
>
Floodplain Documents
>
Backfile
>
4001-5000
>
FLOOD04311
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:45:53 PM
Creation date
10/5/2006 12:32:22 AM
Metadata
Fields
Template:
Floodplain Documents
County
Pueblo
Community
Pueblo
Stream Name
Fountain Creek
Basin
Arkansas
Title
Pueblo Fountain Creek Flood Control Community File
Date
1/1/2001
Prepared For
CWCB
Prepared By
CWCB
Floodplain - Doc Type
Community File
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />/- <br /> <br />. <br /> <br />. <br />STATE OF COLORADO <br /> <br />EXECUTIVE CHAMBERS <br />136 State Capitol <br />Denver, Colorado 80203 <br />Phone (303) 866-2471 <br /> <br /> <br />Richard D. lamm, <br />Governor <br /> <br />July 8, 1981 <br /> <br /> <br />Colonel Forrest T. Gay III <br />Executive Director, Engineer Staff <br />DAEN-CWP-A <br />Pulaski Building, Room 7103 <br />Washington, D.C. 20314 <br /> <br />Dear Colonel Gay: <br /> <br />We welcome the opportunity to review the proposed Fountain Creek, Pueblo, <br />Colorado, flood control plans and project report before final congressional <br />action. By prior communications with the District Engineer, Albuquerque <br />District, the State of Colorado has been monitoring and providing input into <br />the project formulation process. <br /> <br />The proposed plan as outlined in Volumes I and II of the report entitled "Phase I, <br />General Design Memorandum, Fountain Creek," dated March 1981, has been <br />reviewed by the Colorado Water Conservation Board. The staff's specific <br />comments will be mailed directly to you. Based on the reviews performed by <br />the Board, I am advised that the proposed project design, which has an exceed- <br />ence frequency of once in 200 years, does meet State standards. <br /> <br />I cannot overemphasize the need for this project to the community of Pueblo <br />and its citizenry. Many of the existing residential and business structures are <br />subject to inundation from a I DO-year flood to depths of 10 feet. During the <br />June 1965 flood, many residents were forced from their homes due to flood <br />waters from Fountain Creek. Fountain Creek does have a history of flooding. <br />I strongly support this project and am prepared to provide testImony on the <br />benefits of the project. <br /> <br />We desire to be fully advised on the progress of the project's authorization, <br />funding, and construction phases. To that end, we look forward to working <br />with the Corps of Engineers and local sponsors. <br /> <br />Sincerely, <br /> <br /> <br />~~~ <br /> <br />Rich rd D. Lamm <br />Gove nor <br /> <br />cc: Senator William Armstrong <br />Senator Gary Hart <br />Representative Ray Kogovsek <br />Representative Ken Kramer <br />Mr. Don Luster <br />Fountain Creek Commission <br />bce: Monte Pascoe <br />Bill McDonald <br />
The URL can be used to link to this page
Your browser does not support the video tag.