My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD04286
CWCB
>
Floodplain Documents
>
Backfile
>
4001-5000
>
FLOOD04286
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:45:49 PM
Creation date
10/5/2006 12:31:07 AM
Metadata
Fields
Template:
Floodplain Documents
Designation Number
23
County
Adams
Community
Westminster
Stream Name
Big Dry Creek
Basin
South Platte
Title
Major Drainageway Planning - Master Plan - Big Dry Creek - Westminster - Volume I
Date
3/1/1973
Designation Date
7/1/1973
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />TABLE I V"5 <br /> <br />INFilTRATION TEST R~SUlTS <br /> <br />IV-12 <br /> <br />Test location Infl 1 tratloll <br />Number 1/4 1/4 Sec. Twn. ~ _~_ill/hr ____.Remarks <br /> <br />NW <br /> <br />1 S <br /> <br />68w <br /> <br />2.-] /2 <br /> <br />SW <br /> <br />27 <br /> <br />2 <br /> <br />NW <br /> <br />27 <br /> <br />68w <br /> <br />SW <br /> <br />IS <br /> <br />3 <br /> <br />14 <br /> <br />H/4 <br /> <br />SW <br /> <br />SW <br /> <br />2S <br /> <br />69W <br /> <br />4 <br /> <br />14 <br /> <br />69W <br /> <br />3/4 <br /> <br />SW <br /> <br />2S <br /> <br />SW <br /> <br />5 <br /> <br />SW <br /> <br />14 <br /> <br />69W <br /> <br />3 <br /> <br />2S <br /> <br />NW <br /> <br />6 <br /> <br />14 <br /> <br />69W <br /> <br />1-,3/4 <br /> <br />NW <br /> <br />SW <br /> <br />2S <br /> <br />7 <br />8 <br /> <br />SE <br /> <br />IS <br /> <br />69W <br />69W <br />68w <br /> <br />8..1/2 <br /> <br />NW <br /> <br />35 <br />35 <br /> <br />1 S <br /> <br />10 <br /> <br />NW <br /> <br />SE <br /> <br />9 <br /> <br />3 <br /> <br />2S <br /> <br />1/8 <br /> <br />SW <br /> <br />SW <br /> <br />Test on thick grass - <br />s003ked from heavy rain <br />the day before test. <br /> <br />Test on imported back- <br />fill compacted to 100 <br />per cent, no grass, <br />ground soaked from <br />heavy ra I n the day be- <br />fOI.e tesL <br /> <br />Test <br />so I I <br />test. <br /> <br />on natural bare <br />wetted before <br /> <br />Test on medium grass - <br />wetted before test. <br /> <br />Test on medium grass - <br />"etted before tes t. <br /> <br />Test on naturai soil - <br />"etted befo re tes t. <br /> <br />Test on dry grass <br /> <br />Test on dry grass <br /> <br />Test on medium grass - <br />test ran continually <br />for 50 hours. <br /> <br />;'These tests were compared to numerous pervious tests in general area, <br />but out of Bid Dry Basin, to obtain average infiltration rate of <br />one Inch per hour for existing conditions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.