My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD04286
CWCB
>
Floodplain Documents
>
Backfile
>
4001-5000
>
FLOOD04286
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:45:49 PM
Creation date
10/5/2006 12:31:07 AM
Metadata
Fields
Template:
Floodplain Documents
Designation Number
23
County
Adams
Community
Westminster
Stream Name
Big Dry Creek
Basin
South Platte
Title
Major Drainageway Planning - Master Plan - Big Dry Creek - Westminster - Volume I
Date
3/1/1973
Designation Date
7/1/1973
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />111-4 <br /> <br />presently occurring in the channel (I ined channel and closed conduit) <br />will serve to increase the downstream peaks and increase structural <br />costs. <br /> <br />To determine the effects of malnstem detEmtlon, a hydrograph was <br />determined excluding Bas Ins A, B, C and D. This ~lOuld represent total <br />storage of Basins C and D (Basins A and B are already stored in Standley <br />Lake and Great Western Reservoir). By providing 1000 acre-feet of stor- <br />age for total ponding of Basins C and D, the discharge at County Line <br />Road is reduced from 14,000 cfs to 13,!i00 cfs" in other words, while <br />having a profound effect on the sizing of flood plain structures and <br />channels immediately downstream of U.S" Highway 36, the flood peak Is <br />near I y regenerated by the end of the study area. The cos t of P I"OV i d- <br />ing 1000 acre-feet of malnstem storage is estimated at $1.5 million, <br />and we do not believe that this expense is justified (see Section VII I) <br />nor Is it likely that such a dam 15 pol it Ical Iy feas ible. <br /> <br />Related to malnstem detention storage Is the matter of on-site <br />storm runoff detention. By using reasonable on-site detention over the <br />entire basin, the resulting flood peak at the County Line Road might be <br />reduced from the 14,000 cfs figure to lIS low lIS perhaps 10,000 cfs. In <br />combination with mainstem detention storage on tributary channels, the <br />flood peak could be reduced to as low "5 9,5CO cfs (the IDa-year runoff <br />under existing conditions). <br /> <br />It Is Important to note that the E,ffects of on-s ite, and tributary <br />channel malnstem detention would significantly affect the Big Dry <br />Creek tributaries. The on-site detention storage would particularly <br />reduce the costs of storm sewers and other "initial storm runoff" <br />f ac i I I ties. <br /> <br />As there are presently no ordinances in force for on-site deten- <br />tion, this alternate was not considered viablE' for this study; however, <br />due to the phased implementation of the recommended alternate, adjust- <br />ments can be made If on-s ite ponding ordinanCE'S are brought into force. <br /> <br />6. Tunnel. This alternate consists of constructing a tunnel for either <br />all or a portion of the flood waters for a given design flood. The <br />irrigation, and perhaps a portion of the flood flows, would be <br />carried In the existing channel. <br /> <br />While this alternate has many of the same, disadvantages as Alter- <br />nate No.4, a tunnel deserves some add i t lonal thought. Used in combi- <br />nation with the "uti 1 idor" concepts, this alte,rnate could serve to <br />reduce surface flow peaks, provide additional storage, and also pro- <br />vide a corridor through which other vital services may be delivered <br />to rapidly urbanizing areas. The possibil ity also exists for con- <br />sidering pumped storage power developmEmt In connection with Standley <br />Lake serving as the upper storage reservoir. <br />
The URL can be used to link to this page
Your browser does not support the video tag.