Laserfiche WebLink
<br />INSTRUCTIONS TO BIDDERS <br /> <br />. <br /> <br />(CONSTRUCTION CONTRACT) <br /> <br />~ <br /> <br />1. Explanarions w Biddets.-Any explanation de. <br />sired by a bidder regarding the meaning or interpretation <br />of the invitation for bids, drawings, specificatiC'!'ls, etc., <br />must be requested li: ',,"citing and with sufficient ttme al. <br />lowed for a reply to re.lch bidders before the submission <br />of their bids, Any interpretation made will be in the form <br />of an amendment of the invitation for bids, drawings, <br />specifications, ete.. "nd ",ill be furnished to all prospec- <br />tive bidde-,;, Its rece,pt by the bIdder must be acknowl- <br />edged in the space F'oviJed on the Bid Form (Standard <br />Form 21) nr by letter 'f telegram received before the <br />time set for opening of bids. Oral explanations or instruc- <br />tions given before the award of the contract will not be <br />binding, <br /> <br />'h <br /> <br />-; <br /> <br />2. Conditions Affecting rhe Work.-Bidders should <br />visit the site and take such other steps as may be reason- <br />ably necessary to ascertain the natEre and loc?.tion of the <br />work, and the gene!'al and local conditions which can <br />affect the work or the cost thereof. Failure to do so will <br />not relieve bidders from responsibility for estimating <br />properly the difficulty or cost of successfully performing <br />the work. The Government will assume no responsibility <br />for any understanding or representations concerning con- <br />ditions made by any of its officers or agents prior to the <br />execution of the contract, unless included in the invitation <br />for bids, the specifications, or related documents. <br /> <br />3. Bidder's Qualificarions.-Before a bid is consid- <br />ered for award, the bidder may be requested by the Gov- <br />ernment to submit a statement regarding his previous ex- <br />peri(mce in performing comparable work, his business <br />and technical organization, financial resources, and plant <br />available to be used in performing the work. <br /> <br />.. <br /> <br />4. Bid Guaranree.-Where a bid guarantee is required <br />by the invitation for bids, failure to furnish a bid guar. <br />antee in the proper form and amount, by the time set for <br />opening of bids, may be cause for rejection of the bid. <br /> <br />~ <br /> <br />A bid guarantee shall be in the form of a firm com- <br />mitment, such as a bid bond, postal money order, certified <br />check, cashier's check, irrevocable letter of credit or, in <br />accordance with Trea..o;;ury Department regulations... certain <br />bonds or'rlptes of the United States. Bid guarantees, <br />other than bid bonds, will be returned (a) to unsuccess- <br />ful bidders as soon as practicable after the opening of <br />bids, and (b) to the successful hidder upon execution of <br />such further contractual documents and bonds (including <br />any necessary coinsurance or reinsurance agreements) as <br />may be r"<Juired by the bid as accepted. <br /> <br />. <br /> <br />* GPO: 19790.281.187 P.O. 5075 <br />22-106 <br /> <br />If the successful bidder, upon acceptance of his bid by <br />the Governmen~' within the period specified therein for <br />acceptance (sixt)' days if no period is specified) fails to <br />execute such further contractual documents, if any, and <br />give such bond(s) (including an)' necessary coinsurance <br />or reinsurance agreements) as may be required by the <br />terms of the bid as accepted within the time specified (ten <br />days if no period is specified) after receipt of the forms <br />by him, his contract may be terminated for default. In <br />such event he shall be liable for any cost of procuring <br />the work which exceeds the amount of his bid, and the <br />bid guarantee shall be ,,'ailable toward offsetting such <br />difference. <br /> <br />5. Preparation of Bids.-(a) Bids shall be submitted <br />on the forms furnished, or copies thereof, and must be <br />manually signed, If erasures or other changes appear on <br />the forms, each erasure or change must be initialed -by the <br />person signing the bid. Unless specifically authorized in <br />the im'itation for bids, telegraphic bids will not be con- <br />sidered. <br /> <br />(b) The bid form may provide for submission of a <br />price or prices for one or more items, which may be lump <br />sum bids, alternate prices, scheduled items resulting in a <br />bid on a unit of construction or a combination thereof, <br />ete. Where the bid form explicitly r"<Juires that the bidder <br />bid on all items, failure to do so will disqualify the 'bid. <br />When submission of a price on all items is not required, <br />bidders should insert the words "no bid" in the space <br />provided for any item on which no price is submitted. <br /> <br />(c) Unless called for, alternate bids will not be <br />considered. <br /> <br />(d) Modification of bids already submitted will be <br />considered if received at the office designated in the invi- <br />tation for bids by the time set for opening of bids, Tele- <br />graphic modifications will be considered, but should not <br />reveal the amount of the original or revised bid. <br /> <br />6. Submission of Bids.-Bids must be sealed, marked, <br />and addressed as directed in the invitation for bids. <br />Failure to do so may result in a premature opening of, <br />or a failure to open, such bid, <br /> <br />7. Withdrawal of Bids.-13ids may be withdrawn by <br />written or telegraphic request received from bidders prior <br />to the time set for opening of bids, (See par. 8 regarding <br />late withdrawals,) <br /> <br />STANDARD FORM 22 (Rev. :.2 -}.;) <br />Prescribed by GSA. FPR (41 CFR) I-h~.IJl <br />