Laserfiche WebLink
<br />; <br /> <br />2 <br /> <br />The modifications are effective as of the date shown above, The map panel(s) as listed above and as <br />modified by this letter will be used for all flood insurance policies and renewals issued for your community, <br /> <br />The following table is a partial listing of existing and modified BFEs: <br /> <br />Location <br /> <br />Existing BFE <br />(feet)* <br /> <br />Modified BFE <br />(feet)* <br /> <br />At Main Street <br />At Middle Park School Detention Pond <br />Area near the intersection of <br />Front Street and Pine Street <br /> <br />5,350 <br />5,371 <br /> <br />None <br />5,373 <br /> <br />5,332 <br /> <br />5,330 <br /> <br />*Referenced to the National Geodetic Vertical Datum, rounded to the nearest whole foot <br /> <br />Public I!otification of the modified BFEs will be given in the Louisville Times on or about February 23 and <br />March 1, 2000, A copy of this notification is enclosed, In addition, a notice of changes will be published <br />in the Federal Register, Within 90 days of the second publication in the Louisville Times, a citizen may <br />request that FEMA reconsider the determination made by this LOMR, Any request for reconsideration <br />must be based on scientific or technical data. All interested parties are on notice that, until the 90-day <br />period elapses, the determination to modify the BFEs presented in this LOMR may itself be modified, <br /> <br />Because this LOMR will not be printed and distributed to primary users, such as local insurance agents and <br />mortgage lenders, your community will serve as a repository for these new data, We encourage you to <br />disseminate the information reflected by this LOMR throughout the community, so that interested persons, <br />such as property owners, local insurance agents, and mortgage lenders, may benefit from the information, <br />We also encourage you to prepare a related article for publication in your community's local newspaper, <br />This article should describe the assistance that officials of your community will give to interested persons <br />by providing these data and interpreting the NFIP maps, <br /> <br />We will not physically revise and republish the FIRM and Flood Insurance Study (FIS) report for your <br />community to reflect the modifications made by this LOMR at this time, When changes to the previously <br />cited FIRM panel(s) and FIS report warrant physical revision and republication in the future, we will <br />incorporate the modifications made by this LOMR at that time, <br /> <br />This LOMR is based on minimum floodplain management criteria established under the NFIP, Your <br />community is responsible for approving all floodplain development, and for ensuring all necessary permits <br />required by Federal or State law have been received, State, county, and community officials, based on <br />knowledge of local conditions and in the interest of safety, may set higher standards for construction in the <br />SFHA, If the State, county, or community has adopted more restrictive or comprehensive floodplain <br />management criteria, these criteria take precedence over the minimum NFIP criteria. <br />