Laserfiche WebLink
<br />e <br /> <br />" <br /> <br />. <br /> <br />e <br /> <br />Note: Headwater depth determined in b(3) becomes in- <br />creasingly less accurate as the headwater com- <br />puted by this method falls below the value <br />V2 <br />D + (1 + ke)2g' (See discussion under "Culvert <br /> <br />Flowing Full with Outlet Control", p. 5-9.) <br /> <br />c. Compare the headwaters found in Step 3a and Step 3b (In- <br />let Control and Outlet Control). The higher headwater <br />governs and indicates the flow control existing under <br />the given conditions for the trial size selected. <br /> <br />d. If outlet control governs and the HW is higher than is <br />acceptable, select a larger trial size and find HW as in- <br />structed under Step 3b. (Inlet control need not be <br />checked, since the smaller size was satisfactory for this <br />control as determined under Step 3a.) <br /> <br />Step 4: Try a culvert of another type or shape and determine size and <br />HWby the above procedure. <br /> <br />Step 5: Compute outlet velocities for size and types to be considered <br />in selection and determine need for channel protection. <br /> <br />a. If outlet control governs in Step 3c above, outlet veloc- <br /> <br />ity equals t, where Ao is the cross-sectional area of <br /> <br />flow in the culvert barrel at the outlet. If dc or ~ is <br />less than the height of the culvert barrel use Ao corres- <br />ponding to dc or ~ depth, whichever gives the greater <br />area of flow. Ao should not exceed the total cross- <br />sectional area A of the culvert barrel. <br /> <br />b. If inlet control governs in step 3c, outlet velocity can <br />be assumed to equal mean velocity in open-channel flow <br />in the barrel as computed by Manning's equation for the <br />rate of flow, barrel size, roughness and slope of culvert <br />selected. <br /> <br />Note: Charts and tables are helpful in computing outlet <br />velocities. (See references p. 5-14.) <br /> <br />Step 6: Record final selection of culvert with size, type, required <br />headwater, o~tlet velocity, and economic justification. <br /> <br />5-17 <br />