Laserfiche WebLink
<br />j <br />~ <br /> <br />GENERAL INST ALLA TION OF STRAW BALES <br />1.Xt' STAKE OR <br />1"X r STAKE <br />WEDGE LOOSE-- STRAW <br />BETWEEN BALES <br /> <br /> <br />4. MIN. <br /> <br /> <br />BAlES MUST BE TIGHTLY <br />ABumNG WITH NO GAPS <br /> <br />1. EXCAVATE THE TRENCH <br /> <br />2, PLACE AND STAKE STRAW BALES <br /> <br />BACKFILL MATERIAL <br />FROM TRENCH <br /> <br /> <br />3. BACKFILL AND COUPACT EXCAVATED SOIL <br /> <br />l'Xt' WOOD STAKE <br />(OR 1"Xt") <br /> <br /> <br />STAKED AND ENTRENCHED <br />50 LB. (APPROXIMATE) <br />STRAW BALE <br /> <br />COt.lPACTED SOIL TO <br />PREVENT PIPING <br /> <br />SEDlt.lENT lADEN RUNOff <br /> <br />IElI <br />'mklf:kTITMll!~1f~' _ I 4"(t.lIN.)lkI7 <br />'3ISISIElISIE""6"(Mlti~V~ISISI,_,IS!r <br />T <br />CROSS-SECTION OF A PROPERLY INSTALLED STRAW BALE <br />