Laserfiche WebLink
<br />P.4/5 <br /> <br />...;. <br /> <br />" <br /> <br />APR 27 '98 04:20PM COLO OFF OF EMERGENCY MANAGEMENT <br />. <br /> <br />-, <br /> <br />. <br /> <br />2. CANON CITY - ConstrUction ofDetenuon Ponds aloni the western bounda:y of <br />the city to protect city stxeeu from sediment and debris. <br /> <br />Project CAst: S319,OOO. Fed Share S235,OOO/Applicant Share $84,000 <br /> <br />. CAnstiuction of 6 low height dams across 6 openings in the eastern hogback to <br />pond water during storm events to prevent sediment and debris from flowina; <br />onto city streets. <br /> <br />COMMENTS <br /> <br />Project is not eligible under HMGP. Project as proposed does not protect life or <br />property. Project as desaibed is a City maintenance problem. <br /> <br />Recommend the S235,OOO allocated to this project be put into anotJ?e:r project for <br />Canon City that would mitiiatc against risk to life and property or redirect funds <br />to the Wlley project. <br /> <br />3. WILEY - Structural Flood Control Measures to protect 12 stIUctures. <br /> <br />Project cost S175,030. Fed Share Sl31,270/Applicant Share $43,760 <br /> <br />· ConstrUct levees on the east and west sides of Wiley Drainaj:c ditch upstream <br />ofStateHWy 196. <br /> <br />COMMENTS <br /> <br />Proposed project has not taken the adverse effect on the bridge into account. <br />Project would need to include damage or replacement costs on the CDOT bridge <br />in the B/e analysis. <br /> <br />Recommend using the dollars from the Canon City project to timd an acquisition - <br />and/or elevation projcct to solve the flooding problems in Wiley. Acquisition .- <br />and elevation projects qualify as CATEXes. <br />